LudwigshafenThe boarding bridge is movableAnalysis of several reasons for bad

announcer:hp161HP196399230 release time:2024-02-18 11:08:13

Embedded boarding bridge, as the name suggests, refers to the boarding bridge embedded in the loading and unloading operation platform. The installed boarding bridge main board surface is horizontal with the upper plane of the loading and unloading operation platform. Completely integrated into the platform, it will not affect other operational tasks on the platform without loading and unloading operations. The boarding bridge with this type of structure is widely used and is also a relatively fast boarding auxiliary device. Its design is usually fully standardized as early as the structural design of buildings. We are a long-term manufacturer of boarding bridges. Welcome to inquire

Operation degree: There are two types of operations that can be used to raise and lower the boarding bridge. One is a manual pump station which uses manual hydraulic lifting, which is labor-intensive and somewhat labor-intensive. Advantages: It can be operated and used in any situation. Two types of electric pump stations use electric hydraulic lifting and lowering, which reduces labor intensity and saves labor. Disadvantage: Once the power is cut off,LudwigshafenVehicle mounted boarding bridge, it will not be able to be used, the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.

Embedded boarding bridge, as the name suggests, refers to the boarding bridge embedded in the loading and unloading operation platform. The installed boarding bridge main board surface is horizontal with the upper plane of the loading and unloading operation platform. Completely integrated into the platform it will not affect other operational tasks on the platform without loading and unloading operations. The boarding bridge with this type of structure is widely used and is also a relatively fast boarding auxiliary device. Its design is usually fully standardized as early as the structural design of buildings. We are a long-term manufacturer of boarding bridges. Welcome to inquire

.Open planning before placement makes it easy to clean up clutter.

The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time, according to the characteristics of the work, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems, strengthen dynamic management of equipment faults, monitor the status of key parts, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, establish a spare parts warehouse for vulnerable and commonly used parts, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers, strengthen the professional quality and professionalism of lifting platform maintenance personnel, so that they can handle faults in a short period of time.

Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, motor rotates but lifting platform does not rise, lowering valve is open,LudwigshafenFixed boarding bridge, overflow valve pressure is low, oil level is too low, oil suction filter is blocked,LudwigshafenHydraulic boarding bridge factory, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.


LudwigshafenThe boarding bridge is movableAnalysis of several reasons for bad



When it comes to fixed hydraulic boarding bridges, I believe

When conducting high-altitude operations on dangerous edges such as roofs, suspension bridges slopes, or cliffs, guardrails or safety nets should be installed on the side facing the air, or safety belts or ropes should be used.

Install a 5m high protective railing around the foundation pit of the simple boarding bridge, with a distance of no less than 1m from the protective railing to the foundation pit. The mobile boarding bridge only requires a single person to operate, and can achieve safe and fast loading and unloading of goods. Mobile boarding bridges are widely used in cargo platforms and mobile loading and unloading sites without loading and unloading equipment. They are auxiliary equipment for cargo loading and unloading that is used in conjunction with forklifts. The sequence of earthwork excavation must comply with design conditions and follow" Trenching support, support first and then excavation, layered excavation, no overbreak&rquote; The principle of.

original.Connection for. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

The width of the boarding bridge also requires a certain width of its own. However, if the width is too small, it is not conducive to forklift loading and unloading of goods. If the width is too large, it can occupy a certain space, which is not necessary. So a reasonable width is necessary, usually the width of the electric hydraulic boarding bridge is 1800mm, 2000mm, and 2100mm. The width of the bridge is divided into internal width and total width. As we have already mentioned, the internal width is the width of the passage and the total width mainly refers to the width of the guardrails on both sides plus the width of the passage. The total width can be ignored in use, but everyone still cares about the internal width, which is the width of the channel.

  1. Before use, check the boarding bridge for obvious damage such as cracks and broken wires.


LudwigshafenThe boarding bridge is movableAnalysis of several reasons for bad



Open planning before placement makes it easy to clean up clutter.

Potential development.Hydraulic boarding bridges should strictly adhere to the principle of being overweight, as overloading may cause damage to objects; Working on a lifting platform without protective barriers may cause personnel to fall and cause casualties.

Maintain the hydraulic system of the hydraulic boarding bridge. Keep the hydraulic oil of the hydraulic boarding bridge clean: Store the oil in a clean location, and be careful when changing or refueling. Only use a cleaning funnel equipped with a fine mesh filter to pour oil from the container into the oil tank. Of course, the oil you use should be the type recommended by the equipment manufacturer.

For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

Ludwigshafen.During excavation, if unidentifiable items or unforeseeable situations are found, the operation should be stopped in a timely manner and reported to the person in charge of the hydraulic boarding bridge for handling. The fixed boarding bridge is an auxiliary equipment for loading and unloading in conjunction with the storage platform. This equipment is integrated with the platform and can be adjusted up or down according to the different heights of the truck carriage, making it convenient for forklifts to enter the carriage. The equipment adopts an imported hydraulic pump station with anti rolling skirts on both sides, making work safer and improving work efficiency.

Operation degree: There are two types of operations that can be used to raise and lower the boarding bridge. One is a manual pump station, which uses manual hydraulic lifting, which is labor-intensive and somewhat labor-intensive. Advantages: It can be operated and used in any situation. Two types of electric pump stations use electric hydraulic lifting and lowering, which reduces labor intensity and saves labor. Disadvantage: Once the power is cut off, it will not be able to be used, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.