SasariSelf propelled electric elevatorWhat are the changes in the market?

announcer:hp935HP175192871 release time:2024-02-15 09:28:36

To ensure safe and reliable braking of the lifting platform and prevent accidents,SasariElectric six meter elevator, a hydraulic control one-way valve, also known as a hydraulic lock, is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB1&flash; The rotation of the SB6 motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease, and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.

Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, the operating failure rate can be reduced to a low level.

Sasari.Do not move after lifting,SasariSelf propelled electric elevator, and do not lift until the four legs are firmly supported.

Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

.During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.

Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.


SasariSelf propelled electric elevatorWhat are the changes in the market?



Installation and dismantling personnel and drivers should hold certificates to work.

Only after the operation of professional personnel can the suspension cage movement be restored.

Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

Fair price.Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent

Setting requirements: Each landing entrance should be equipped with a landing door which should cover the opening with its full width, but also have an overflow valve to prevent excessive system pressure during upward movement


SasariSelf propelled electric elevatorWhat are the changes in the market?



Buffer. In order to increase the energy for the car to hit the top or sink to the bottom. Remove rubber or sponge from the buffer and cabin to increase their impact energy; Rope groove slipping and other accidents caused the car to suddenly fall, resulting in a safety clamp. To prevent breakage of the lifting wire rope. A safety clamp that can simultaneously cut off the power supply and stop the car from falling should be removed from the car. A car without safety tongs is not allowed to ride or carry people. If it is a simple electric elevator, it is driven by the pressure generated by its own weight, greatly saving energy and reducing consumption.

Construction electric elevators should be equipped with safety devices to prevent the cage from falling. The anti fall safety device should be functional at all times, including installation, disassembly, and before resetting after action. Fall arrest safety gear

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements,SasariElectric elevator lifting by 4 meters, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.

Sasari.The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door the door may not meet the above requirements, but safety should be maintained.

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.