Schigerzent michlos35 meter elevatorIs the market restricted by the industry

announcer:hp323HP155335083 release time:2024-02-06 12:11:14

Single column aluminum alloy elevator with easily recognizable operation panel, multiple mechanical, electrical, and hydraulic safety protection, and advanced integrated hydraulic electricity

The elevator has a strong load-bearing capacity and is suitable for two people (who can carry a certain amount of weight tools and materials) to climb high at the same time; Various non-standard products can also be customized according to different environments to meet different needs.

Schigerzent michlos.Check the overall structure for any deformation and damage to important components, especially load-bearing support rods, chains, etc.

Four column aluminum alloy elevator: the whole elevator is made of high-strength aluminum profiles. Due to the high strength of the profiles, which has excellent stability, flexible operation, large load capacity, and heavier and larger high-altitude work tools should be hung on stable components and cannot be placed randomly to avoid the occurrence of high-altitude falling accidents.

The hook of the seat belt should not be hung on unstable or moving objects.

The product has a sturdy structure, a large load-bearing capacity smooth lifting, simple and convenient installation and maintenance, making it an ideal and economical cargo conveying equipment for replacing elevators between low floors. The editor will share with you some common knowledge about daily maintenance of outdoor elevators: When personnel enter the interior of the lifting platform for maintenance, they must hang the elevator to prevent sudden lowering of the platform and causing casualties.


Schigerzent michlos35 meter elevatorIs the market restricted by the industry



The load capacity of goods and the tonnage of goods transported at once also affect the speed of lifting and lowering. Achieving the excellent value of the lifting platform for transporting goods is a guarantee of speed. If the weight is too heavy, it affects the speed. If the goods are too light, it also affects the normal transportation time.

Novice operators: Due to their lack of understanding or lack of understanding of the operation methods of high-altitude work platforms such as mobile elevators, it is easy for them to make mistakes and cause equipment malfunctions. Operators in this area need to patiently learn and pass training before they can operate and use them.

When working at heights exceeding 1.5 meters safety nets or safety belts must be used.

Quality documents.Hydraulic lifting platforms are widely used in factory maintenance, municipal construction, and decoration of hotels in industrial and mining enterprises, with reliable quality and perfect performance.

In addition,Schigerzent michlosConstruction site construction elevators, it is strictly prohibited to use hammers or other tools during installation to prevent excessive axial or radial force from damaging bearings or gears. Be sure to tighten the installation bolts before tightening the tension bolts. Before installation,Schigerzent michlosFully automatic elevator electric, clean the anti rust oil on the motor input shaft, positioning boss and elevator connection parts with gasoline or zinc sodium water. Its purpose is to ensure the tightness of the connection and the flexibility of operation, and to prevent unnecessary wear and tear.

The loading and unloading mobile boarding bridge has become a very common structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to quickly enter and exit transportation vehicles for loading and unloading operations.


Schigerzent michlos35 meter elevatorIs the market restricted by the industry



Walking: assisted self-propelled,Schigerzent michlosSecond floor cargo elevator, two wheel traction, self driving, and car modification.

Inspection standard.The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.

Check the overall structure for any deformation and damage to important components, especially load-bearing support rods, chains, etc.

Use a heavy crane to lift the cage and accurately position it from above the standard section; Place the two suspension cages on the guide rail frame and slowly place them on the buffer spring. Prepare the drive frames of the two suspension cages and adjust each back wheel and roller to a position with a large gap to facilitate the installation of the drive frame. Install a standard section on the basic part of the elevator using heavy equipment and tighten the connecting bolts. Install two sets of drive frames above each suspension cage using heavy equipment and thread the connecting pins, and install the cage top guardrail.

Schigerzent michlos.Emergency bolts not tightened; The solution is to tighten the emergency valve.

Install two more standard sections. Check and adjust the verticality of the guide rail frame with a theodolite to ensure that the error in two mutually perpendicular directions meets the requirements of Table 1. The above two parts are about the installation precautions for the elevator. If your work involves operating or installing the elevator, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).