arsenicElectric curved arm elevatorMaterial shielding mechanism

announcer:hp935HP175192871 release time:2024-02-04 17:13:17

Especially suitable for steel structured factories, and the main protective accessories include safety belts, guardrails, protective covers, platforms and stairs, etc.

arsenic.When a single steel wire rope is excessively stretched,arsenicElectric lifting scissor lift,arsenicElectric small elevator, the Electrical safety device shall stop the operation of the electric lift.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

.Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil,arsenicElevator electric 6 meters, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.

Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.


arsenicElectric curved arm elevatorMaterial shielding mechanism



The safety distance between the outer edge of the upper part of the landing door and the moving parts of the electric elevator during normal operation should not be less than 0.75m; If the rated speed is not greater than 0.7m/s, the safety distance can be 0.40m.

Setting requirements: Buffers should be installed below the suspension cage and counterweight running channel.

The verticality of the guide rail frame should meet the requirements of the specifications.

Meticulous workmanship.Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm, and the top layer is not affected. It can be customized according to the location and environment.

Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).

As a material loading and unloading equipment recognized by customers in the lifting platform, the guide rail hydraulic lifting platform is superior in terms of product, and operating costs. The editor of the electric elevator will provide a detailed analysis: the advantages of the product are that the equipment bears a large load, can achieve multiple points, and can be controlled up and down floors to achieve safe use.


arsenicElectric curved arm elevatorMaterial shielding mechanism



The use of a lifting platform as a tool for storing performance blankets, soft scenery, etc. In some theaters, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets, soft scenery etc.

index.Setting requirements: For construction electric elevators with foundations installed on roof slabs, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

The use of fully autonomous electric elevators can create more benefits and ensure safety in all aspects.

Secondly or other lower suspended structures, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

arsenic.Setting requirements: The landing door should be standardized and tooled.

There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.