SentesSelf propelled hydraulic lifting platformInstallation manuals and methods

announcer:hp695HP135175170 release time:2024-01-31 17:08:00

The hook of the seat belt should not be hung on unstable or moving objects. High priced and various specifications of scissor lift manufacturers provide timely supply, with high cost-effectiveness, and have become the preferred brand for many wire products. Welcome to purchase!

What are the advantages of installing a guide rail type elevator for goods? The advantages of civil engineering are easy to install: there is no need for a machine room above the shaft, and the top layer can be installed at a height of more than 5 meters. The computer room can be located within a radius of 15 meters of the shaft, occupying an area of only 3-4 square meters. The hydraulic elevator is not equipped with a counterweight device to improve the utilization rate of the shaft area. The load and load cylinder of the hydraulic elevator directly act on the foundation pit, and the strength requirement for the shaft is low. A brick structure or brick concrete structure shaft is sufficient.

Sentes.Gear pump worn, aged or damaged; The solution is to replace the gear pump.

How to install and use the bearings of the elevator? During the process of using the bearing device of the elevator, we cannot always ensure that the bearing device has the right orientation, which inevitably leads to some devices not being in place or bearing displacement. Once these problems occur in the device, it will cause the clearance between the bearings to become too small, and then make it impossible for the inner and outer rings of the bearings to be in the same rotation center. So it is necessary to use specialized tools when installing bearings, and in the future, it is also necessary to use a testing instrument to test the bearing installation, mobile boarding bridge merchants are increasingly interested in using boarding bridges to provide customers with the appearance of hydraulic boarding bridges,SentesFixed hydraulic lifting platform, and the demand for boarding bridges is also increasing. However, there are not many manufacturers of corresponding boarding bridges. Many boarding bridges are made of leather bags, and they do not produce them themselves, resulting in high prices. What is important is that they do not have a good understanding of the technology of car exhibition booths. When passing on direct customer technical requirements to the manufacturers, there are often deviations. Therefore, customers who purchase boarding bridges can directly find professional manufacturers. When choosing a boarding bridge, the first thing to consider is the range of use, frequency of work utilization, rated weight, and other factors of the product, and choose a boarding bridge that is suitable for the requirements of the unit. Conduct market research based on the proposed technical parameters. The first condition for selecting a supplier is to consider the manufacturer of the boarding axle, and then the after-sales service capability. As long as it is a fixed boarding bridge with good product quality, excellent performance and complete equipment, it can be chosen at a reasonable price.

Although lifting cargo elevators have good safety, in practical work, if we do not pay attention to detailed maintenance, accidents may occur. Therefore, we should pay attention to them when performing daily maintenance.

Regular inspection and maintenance eliminating hidden dangers,SentesHydraulic lifting platform and hydraulic lifting platform,SentesElectric lifting platform, and troubleshooting are beneficial for improving work efficiency, extending equipment service life, and ensuring the safety performance of elevators.


SentesSelf propelled hydraulic lifting platformInstallation manuals and methods



It is strictly prohibited to connect the motor of the lifting platform to the wrong power supply. It should be ensured that the voltage is 380V or 220V, and daily cleaning work should be carried out. Dust and debris on the motor should be cleaned in a timely manner.

When using the hydraulic lifting platform, it is also necessary to check for overheating, as this equipment is equipped with a motor. If the motor is overheated, it may cause damage to the motor. However, replacing a motor is relatively expensive. Therefore, during driving or trial operation, if the motor is found to be overheated, it should be stopped immediately, and then the fault that caused the motor to overheat should be checked and eliminated, hydraulic elevators are more popular among people and people can choose the one that suits them according to their actual situation. However, during normal work, it is important to pay attention to the lifting speed of hydraulic elevators and avoid making mistakes. So what factors will affect the lifting speed of hydraulic elevators?

Focus on Development.The explanation mainly focuses on the mechanism of lifting platforms, and now there are many different types of lifting platforms. In order to better use lifting platforms, we have started to develop different industries using different lifting platforms. Electric lifting platforms have become the main product of small lifting platforms. They are small in size, light in weight, practical in appearance, easy to move, stable and free in lifting, large in load capacity, and lifting equipment is used in enterprises of all sizes, so the use of lifting platforms is necessary.

The correct construction inspection of the airport is to first inspect the foundation to see if there is any water accumulation and to see if the grounding system meets the requirements. We also need to see how the structural bolts of this frame are tightened, and whether there are any cracks in the welds. We need to set them according to the instructions. In mechanical transmission, it can be divided into two types: open type and closed type. Of course, there are also many safety equipment for elevators.

Firstly, it is necessary to use and operate the elevator correctly. The operators should receive systematic operation training: regular inspection of operating standards should be conducted, and any violations of the elevator operation should be punished immediately. In severe cases, they should be transferred from this position. Since the passing of


SentesSelf propelled hydraulic lifting platformInstallation manuals and methods



Today, the sudden cooling in Shandong has caught office workers and people off guard. Friends, be sure to add more clothes when going out. Shandong, as the hometown of elevators in China. There are countless manufacturers of all sizes. So, how to maintain and maintain the lifting stage and elevator after entering winter. Below is a detailed introduction from the editor.

Installation works.The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.

This series of products has a load capacity of 0.1 to 0.8 tons, with a load capacity of up to 10 tons.

How to maintain elevators in winter is one reason and the primary reason. Many workers in other industries do not know that hydraulic elevators use different types of hydraulic oil in summer and winter. Often, at low temperatures, the hydraulic oil used in summer can become, or even freeze. After entering low temperatures in winter, it is important to remember to replace hydraulic oil containing antifreeze, which is suitable for working at low temperatures.

Sentes.The load capacity of goods and the tonnage of goods transported at once also affect the speed of lifting and lowering. Achieving the excellent value of the lifting platform for transporting goods is a guarantee of speed. If the weight is too heavy, it affects the speed. If the goods are too light, it also affects the normal transportation time.

Hydraulic oil should be kept clean and replaced every 6 months; When repairing, maintaining, and cleaning the elevator, be sure to support the support rod.

Use a heavy crane to lift the cage and lift it from above the standard section