BisegliElectric pulley elevatorWhat scope is the production line suitable for

announcer:hp935HP175192871 release time:2024-01-31 10:12:09

The net height of the landing door opening should not be less than 8m, and the difference between the net width and the outlet width of the cage door should not exceed 120mm. When the floor door is closed, except for the gap between the lower part of the door that should not exceed 35mm, the size of any through-hole and opening related to the distance between any door and adjacent moving parts, as well as the gap around the door or between parts, should comply with the provisions of Table 4 of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB23821-2009.

From the above comparison,BisegliSelf propelled electric elevator, it can be seen that hydraulic electric lifting mechanisms have stable lifting,BisegliManned electric elevator, low noise long service life, large load bearing capacity, making them suitable for use in stage equipment.

Bisegli.The inner bearing of the roller in the device is in good condition, and a complete grease film surface is maintained between the curved surface of the roller and the main chord of the aluminum alloy electric elevator. A good grease film surface can reduce wear and noise

Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, the operating failure rate can be reduced to a low level.

.During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.

For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.

Setting requirements: For construction electric elevators with foundations installed on roof slabs, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.


BisegliElectric pulley elevatorWhat scope is the production line suitable for



During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.

We have all purchased the aluminum alloy electric elevator equipment, which is compact and easy to carry. Many garden style hotels, hospitals, airports, and large parking lots also wear this equipment,

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

Credit guarantee.The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

According to the needs of different performance genres, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, an extended stage, an island stage, an intermediate stage, a T-shaped stage, or a hall.

Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened,BisegliPortable electric elevator, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.


BisegliElectric pulley elevatorWhat scope is the production line suitable for



Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.

quality index.Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

It is strictly prohibited to use travel limit switches as switches to stop operation.

There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least 2.5 meters.

Bisegli.According to the needs of different performance genres, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage, an extended stage, an island stage, an intermediate stage a T-shaped stage, or a hall.

Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.

When the door is closed, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts should comply with the provisions of Table 4 of GB 23821-2009.