GreensboroAluminum alloy lifting platformApplicable occasions

announcer:hp275HP127226562 release time:2024-01-30 15:51:27

02 The lifting platform adopts a fully hydraulic lifting mechanism, which can be operated inside the platform bucket and on the elevator body. 03 The working arm of the lifting platform can rotate 360 degrees. 04 The hydraulic system is equipped with a safety valve to prevent the main arm oil cylinder oil pipe from cracking. 05 The hydraulic legs are equipped with a hydraulic locking device to prevent the leg oil cylinder from retracting. 06 The hydraulic system is equipped with an automatic platform overload protection device, In order to ensure the safety of operators, each section of the working arm on the platform 07 is equipped with safety limit devices. The hydraulic system seals on the platform 08 are all well-known domestic and foreign brands, and the power of the entire vehicle 09 is a diesel engine with its own power supply. The power supply can also be used. The hydraulic lifting platform is equipped with an emergency lowering device in case of power outage. The 11 folding arm lifting platform product can also use a 50Hz, 380V power motor and diesel engine dual power.

Folding arm lifting platform product features 01 Folding arm lifting platform High altitude operation platform 360 degree rotation without external power supply, can work across obstacles, lifting smoothly and safely. The curved arm lifting platform adopts a curved arm working arm, and the scope and space of operation are not affected.

Greensboro.The reduction gearbox, external meshing gear and other parts, are all carried out according to the requirements in the table.

Outbound call form: Outbound call boxes are pre embedded or installed in a column style on the wall or ground near the parking floor above and below the platform, and are linked to operate the platform up and down.

.The arrangement of vibration points should be based on the vibration aging process standard GB/T25712-20. The vibration aging exciter should be placed at a position with high rigidity and amplitude of the workpiece, and its rotating axis should be parallel to the plane where the effective zone of the vibration mode is located. The exciter should be fixed at the end angle or edge of the workpiece with high rigidity, so that small energy can be used to excite the component with large amplitude. Based on the structural shape of the foundation, we set the vibration points on the protruding plates on each side of the workpiece.

Thermal aging stress relief is generally suitable for small workpieces, while the lifting foundation structure has a large volume and does not have a large enough annealing furnace. Using natural aging takes one year and the production cycle is too long, so neither of these two methods is feasible. After research and understanding by the manufacturer, it was found that selecting appropriate support points for large welded structural components can perform vibration aging stress relief. Therefore, the manufacturer has decided to use vibration aging for stress relief of the platform lifting foundation. Long term promotion of downgrading manufacturers, 20 year old brand, with price advantages and guaranteed quality!

Vibration aging treatment and effect judgment: According to the aging process plan, use a rigid fixture to fix the exciter on the workpiece, and use the manual function of the equipment to test the vibration. It is determined that around 5300 revolutions is the resonance frequency of the component. The amplitude generated by the eccentric gear of the exciter in the fourth gear can meet the vibration processing requirements of the foundation seat, so the excitation force is selected as the fourth gear.


GreensboroAluminum alloy lifting platformApplicable occasions



According to calculations, when the support points of the beam type components are located along the length of 1/9L on both sides, the vibration resistance is relatively small, making it easy to obtain resonance and vibration effects with larger amplitudes. The geometric shape of the structure on the lifting foundation is similar to a long beam type component, and the structure is complex. Therefore, two support points should be taken on each side for time treatment.

Monthly maintenance: View weekly inspection items

Outdoor guide rail lifting platform, mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and an elevation of 1-25 meters, guide rail elevators, also known as hydraulic elevators, can be installed indoors and outdoors. They have a high lifting height and use side mounted oil cylinders, ensuring smooth operation, low noise, convenient maintenance, and long service life. In case of power failure, manual emergency descent can be used, which is safe, convenient, fast, and practical. The pit depth is generally 15cm-30cm. Professional elevator manufacturers have high pressure resistance,GreensboroMobile boarding bridge 10 tons, good waterproof performance, and fire and high temperature resistance, Strong overload capacity, corrosion resistance, radiation resistance, long service life. The top layer height is not affected, and can be customized according to the on-site environment. It is suitable for 2-3 story steel structures or concrete factories, and can be used both internally and externally.

discount.The lifting foundation of the platform is a large structural component made of alloy steel plates with different thicknesses that are welded together. The welding amount is large, the structural shape is complex, and residual stress is inevitably generated during the manufacturing process. In order to prevent deformation of the components due to changes in residual stress during use, it is necessary to perform stress relief treatment on the completed components.

Applicable environment: Indoor or outdoor Applicable temperature: Safety device Safety rocker: When the equipment is running and rising, the rocker will automatically prevent wheelchair platform.

Whether the vibration aging treatment has achieved the results can be judged based on the parameter curve observation method.


GreensboroAluminum alloy lifting platformApplicable occasions



Power supply voltage: Motor power: Lifting: Rocker self reset switch operation Overload protection: Over current relay.

Encyclopedic knowledge.Whether the vibration aging treatment has achieved the results can be judged based on the parameter curve observation method.

The lifting stage is a high-altitude operation equipment, and prolonged use can cause loose connections between some components. So in order to ensure the personal safety of construction workers it is necessary to regularly inspect the lifting stage and tighten any loose components. The lifting stage is a high-altitude operation equipment, and prolonged use can cause loose connections between some components. So in order to ensure the personal safety of construction workers, it is necessary to regularly inspect the lifting stage and tighten any loose components. The interference and hazard analysis of the frequency conversion speed regulation construction elevator circuit is becoming increasingly widespread in the development of technology today. Variable frequency speed regulation has the characteristics of stable start and stop process, reducing mechanical shock, increasing the comfort of passengers, and improving the service life. At the same time, and improve work efficiency. However, there will be interference in the use of variable frequency speed regulation system, which will often cause safety accidents of construction elevator.

Outdoor guide rail lifting platform, mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and an elevation of 1-25 meters, guide rail elevators, also known as hydraulic elevators, can be installed indoors and outdoors. They have a high lifting height and use side mounted oil cylinders, ensuring smooth operation, low noise, convenient maintenance and long service life. In case of power failure, manual emergency descent can be used, which is safe, convenient, fast, and practical. The pit depth is generally 15cm-30cm. Professional elevator manufacturers have high pressure resistance, good waterproof performance, and fire and high temperature resistance Strong overload capacity, corrosion resistance, radiation resistance, long service life. The top layer height is not affected, and can be customized according to the on-site environment. It is suitable for 2-3 story steel structures or concrete factories,Greensboro6-meter aluminum alloy lifting platform, and can be used both internally and externally.

Greensboro.According to GB/T25712-2010, when one of the following situations occurs in the curve related to the aging frequency it can be determined that the area covered by the effective zone of the vibration mode at that frequency has reached the aging effect: the curve rises and flattens; The curve rises, then falls, and then flattens; The resonance frequency of the a-n curve after vibration is lower than that before vibration; The bandwidth of the a-n curve after vibration narrows compared to before vibration; The resonance peak of the a-n curve after vibration exhibits fission phenomenon; The curve flattens out after descent.

Emergency stop: Press the emergency button switch to raise or lower the machine.

According to calculations, when the support points of the beam type components are located along the length of 1/9L on both sides, the vibration resistance is relatively small, making it easy to obtain resonance and vibration effects with larger amplitudes. The geometric shape of the structure on the lifting foundation is similar to a long beam type component, and the structure is complex. Therefore, two support points should be taken on each side for time treatment.