Genhe RiverElectric rope climbing machine elevatorMaintenance and maintenance methods

announcer:hp935HP175192871 release time:2024-01-29 19:09:11

Genhe RiverElectric elevator 8 meters,

Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.

The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, and its attachment distance wall bracket spacing, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.

.Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.


Genhe RiverElectric rope climbing machine elevatorMaintenance and maintenance methods



When the wall bracket adopts non matching standard products,Genhe RiverScissor fork electric lifting platform, design calculations should be carried out.

The occurrence of.

Acceptance: Concrete strength grade C30, strength testing report.

Direct labor.Secondly, for the replacement of hydraulic oil on the lifting platform it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

Every theater is a public place with a large number of people, and safety considerations should be taken into account in stage design. According to relevant national regulations, in order to prevent accidents caused by the crushing of electric elevators or improper control by drivers. Electric elevators should be equipped with the following necessary safety devices to ensure that the car of the electric elevator stops rising or falling in a timely manner.

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.


Genhe RiverElectric rope climbing machine elevatorMaintenance and maintenance methods



The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

Installation requirements.A complete lifting platform accessory can be selected and customized according to different places, venues and environmental usage conditions. Meet the needs of different users. So why lifting platforms can be used and installed in so many industries and places is because they can achieve multi-purpose, demonstrate multifunctional, and win market demand. In modern industrial transportation processes, lifting platforms have begun to play an increasingly important role, whether in airports, docks, warehouses, floors, workshops and other places that require rapid loading and unloading of goods, they have played a very practical value, It has also brought great contributions to the entire industry and even the entire economic development. However, long-term operation and use of these devices inevitably lead to wear and consumption, and regular maintenance and upkeep are essential. Otherwise, both work efficiency and utilization rate will decrease, and at that time,Genhe RiverBackground axis electric elevator, the gains and losses will outweigh the losses.

Unloading platform and attached electric construction platform, etc.

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

Genhe River.Operating cost advantage and low failure rate: Due to the use of advanced hydraulic systems and good methods, the operating failure rate can be reduced to a low level.

Acceptance: Concrete strength grade C30, strength testing report.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).