DuisburgAluminum alloy lifting platform single columnUse customer productivity to improve

announcer:hp275HP127226562 release time:2024-01-29 16:03:52

The arrangement of vibration points should be based on the vibration aging process standard GB/T25712-20. The vibration aging exciter should be placed at a position with high rigidity and amplitude of the workpiece, and its rotating axis should be parallel to the plane where the effective zone of the vibration mode is located. The exciter should be fixed at the end angle or edge of the workpiece with high rigidity so that small energy can be used to excite the component with large amplitude. Based on the structural shape of the foundation, we set the vibration points on the protruding plates on each side of the workpiece.

Power supply voltage: Motor power: Lifting: Rocker self reset switch operation Overload protection: Over current relay.

Duisburg.Check all standard sections and diagonal support connection points. Check the fastening bolts of the gear rack and ensure that the motor cooling wing plate and organization are clean

According to calculations, when the support points of the beam type components are located along the length of 1/9L on both sides, the vibration resistance is relatively small, making it easy to obtain resonance and vibration effects with larger amplitudes. The geometric shape of the structure on the lifting foundation is similar to a long beam type component and the structure is complex. Therefore, two support points should be taken on each side for time treatment.

.However, large welded structural components have the characteristics of complex morphology, large weight, large differences in residual stress size and distribution, and it is difficult to achieve good results using ordinary vibration aging technology. Therefore, it is crucial to develop a reasonable process. Therefore, they found Nanjing Juhang and our JH-700 vibration aging equipment, and requested us to develop a complete vibration aging process.

Power supply voltage: Motor power: Lifting: Rocker self reset switch operation Overload protection: Over current relay.

The safety control voltage of 18 is selected with rolling guide shoes, high accuracy, wear resistance, and the strength requirements of the shaft are low, Brick or brick concrete structure hoistway can be used for Jinchuang lifting platform safety and stability advantages. Overflow valve: It can prevent system pressure from being too high during upward movement. Emergency manual valve: In case of power failure, it can make the elevator emergency descend to the nearest floor position and open the door.


DuisburgAluminum alloy lifting platform single columnUse customer productivity to improve



During aging treatment, the equipment prints the vibration aging curve online. According to the curve, the front end of the a-t curve shows an upward trend, indicating that the damping inside the component decreases after vibration treatment, so the amplitude gradually increases; Since then, the amplitude change has been basically stable, indicating that the structure of molecules inside the component tends to be stable, which conforms to the judgment standard of curve observation strip, thus it can be determined that the workpiece has reached the effect. The precautions for using an electric lifting platform are as follows: the user unit should arrange a dedicated person to operate the lifting platform and develop details and safety precautions for the use of the lifting platform based on their own unit's situation, and hang it in a prominent position. When working on an electric lifting platform, professional drivers and operators must be equipped, and they must undergo specialized training and be qualified. They must hold relevant certificates and take on corresponding responsibilities according to the actual situation of the work. After the construction is completed, the lifting platform needs to be moved on the site and should be operated by a professional driver. Before daily work, zy12 drivers must carefully check the electrical, hydraulic, and mechanical systems of the platform, check the working range of the lifting platform truck, and remove obstacles that hinder the rotation and walking of the lifting platform truck. And empty the platform up and down several times to check for any faults or abnormal phenomena. It is also necessary to pay attention to the accuracy of the platform platform landing station for any obvious abnormal differences. Professional improvement of quality assurance for aircraft manufacturers. The promotional activity is ongoing, and new and old customers are welcome to come for consultation

The reduction gearbox,DuisburgCurved arm lifting platform, gearbox, external meshing gear and other parts, as well as the hydraulic oil, are all carried out according to the requirements in the table.

The second method is the protective layer method, which covers the metal surface of the aluminum alloy lifting platform with a protective layer to isolate the metal products from the surrounding corrosive medium and prevent corrosion. Apply engine oil, petroleum jelly, or cover the surface of steel parts with corrosion-resistant non-metallic materials such as enamel and plastic; Using electroplating, hot plating, spray plating, etc., the safety net below immediately stops running and descends when encountering obstacles.

Outbound call form: Outbound call boxes are pre embedded or installed in a column style on the wall or ground near the parking floor above and below the platform, and are linked to operate the platform up and down.


DuisburgAluminum alloy lifting platform single columnUse customer productivity to improve



Power supply voltage: Motor power: Lifting: Rocker self reset switch operation Overload protection: Over current relay.

Quality risk.Emergency descent: Handle operation or use of manual pressure relief and activation of emergency battery system to implement emergency descent function safety net.

Check and clean the driving gears and guide wheels of the elevator. If there is excessive wear,DuisburgTilting lifting platform, which steel should be chosen for production? Because there are many corrosion-resistant steel materials now it is necessary to start from the source. The current technology is relatively advanced. When manufacturing aluminum alloy lifting platforms, adding chromium, nickel, etc. to ordinary steel to make stainless steel, changing the internal structure of the metal to prevent rust.

Duisburg.According to calculations, when the support points of the beam type components are located along the length of 1/9L on both sides, the vibration resistance is relatively small, making it easy to obtain resonance and vibration effects with larger amplitudes. The geometric shape of the structure on the lifting foundation is similar to a long beam type component, and the structure is complex. Therefore, two support points should be taken on each side for time treatment.

Emergency descent: Handle operation or use of manual pressure relief and activation of emergency battery system to implement emergency descent function safety net.

The driver shall close and lock the movable doors at both ends of the protective fence before work, and then ring the bell to start. It is strictly prohibited to work with the movable doors of the protective fence open. In case of special circumstances during platform operation the emergency stop switch can be used to stop the platform. However, during normal operation, it is prohibited to use the emergency stop switch to stop the platform.