Open the manual valve, slowly lower the boarding bridge, and secure more than 90% of the lip plates at the bottom of the container.

What are the issues to pay attention to when using the boarding bridge? For example, mobile boarding bridges are generally used outdoors, and after use they are also placed outdoors. They are often exposed to wind, rain, and sunlight, which reduces the lifespan of the boarding bridge. Therefore the maintenance of the boarding bridge is very important. When it rains, cover the boarding bridge with a rain cloth to prevent rusting and aging.

Ha.Regularly draining and refilling the oil tank to remove water and sediment is crucial for removing impurities in the oil,HaMobile hydraulic boarding bridge, but regularly emptying the entire hydraulic system is also crucial. This is a reliable way to completely remove system impurities, oxidized hydraulic oil, and other harmful substances. Then, the recommended clean hydraulic oil should be added back to the system. If the oil is completely contaminated, especially when the pump is damaged, the oil in the tank must be cleaned. The oil cleaning device allows the oil to flow until the oil pollution indicator shows that the oil is in a satisfactory state.

The hydraulic system adopts imported Italian brand products, with excellent performance and minimal maintenance. The oil cylinder lifting power system, inclined plate, top, and small oil cylinder operation, can be adjusted smoothly. The height adjustment plate is a selected decorative plate and profile, with a long service life. Various qualified manufacturers of boarding bridges are welcome to inquire by phone and sincerely invite cooperation!

.The safety valve of the mobile hydraulic boarding bridge can also generate high noise. When air is mixed into hydraulic oil, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, we should regularly clean the safety valve, and replace it if it is damaged or severely worn.

The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.

The safety valve of the mobile hydraulic boarding bridge can also generate high noise. When air is mixed into hydraulic oil, the relief valve gets stuck or severely worn, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, and replace it if it is damaged or severely worn.


HaVehicle mounted boarding bridgeQuestions used in aspect



When working in foundation pits or depths,HaMovable boarding bridge, a helmet must be worn.

Fixed loading and unloading bridge: The fixed loading and unloading bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods. Its height adjustment function uses a bridge between the truck and the cargo platform in the warehouse, and forklifts and other vehicles can move and load goods in batches inside the truck. Only one person can work to achieve rapid loading and unloading of goods. It enables enterprises to reduce a large amount of labor, improve work efficiency and obtain greater economic benefits.

There are three movable boards on both sides of the air conditioning board, which can effectively prevent the adjustment board from falling down and keep the pressure foot in a safe state.

wholesaler.The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from 7000mm to 7500mm, mainly considering safety and stability of use. For a long time, the manufacturer of the boarding axle has no turnover to avoid the price difference, which is 20% higher than the market value! More than one ton is more expensive!

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

Monthly maintenance of hydraulic boarding bridges: check for wear on rollers, intermediate shafts and bearings, cylinder pins and bearings, boom hinge shafts and bearings, etc; The oil quality and level of hydraulic oil; The hydraulic boarding bridge should be raised throughout the entire process, and at this position, the hydraulic surface should be 40 to 50 millimeters higher than the bottom of the box. The hydraulic oil is darkened, sticky, or has foreign objects such as gravel. If found, it should be replaced in a timely manner; Add some oil to each part to extend the service life of the bearing. The hydraulic boarding bridge has a wide range of uses. Doing the above points well not only ensures your personal safety but also extends the service life of the equipment, making the boarding bridge better serve you.


HaVehicle mounted boarding bridgeQuestions used in aspect



Do you know some of the working characteristics of hydraulic lifting boarding bridges? Today, I will take you to understand!

production.The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, the lowering valve is not tightly sealed, and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.

Introduction to Fixed Boarding Bridge Loading and unloading Mobile Boarding Bridge is a very common structural form in modern logistics sites. It is the point and endpoint of the enterprise's logistics chain,HaTrain boarding bridge, and is a loading and unloading platform vehicle for enterprises to quickly and turnover products and goods. The height of the loading and unloading operation platform truck is fixed but the height of the transport carriages does not always form a certain height difference or gap between the transport vehicle and the loading and unloading platform. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to quickly enter and exit transportation vehicles for loading and unloading operations.

The hydraulic lifting boarding bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other handling vehicles can directly enter the truck for batch loading and unloading of goods, and single person operations can achieve fast loading and unloading of goods. Reduce a large amount of labor, improve work efficiency, and achieve greater economic benefits for enterprises.

Ha.When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge, as well as noise when the pump station enters the air.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.