EmerodElectric mobile elevatorA bright spot in market demand

announcer:hp935HP175192871 release time:2024-01-28 18:56:39

For customers to use and operate the lifting platform for a long time,EmerodFixed electric elevator, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.

Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent

Emerod.We have all purchased the aluminum alloy electric elevator equipment, which is compact and easy to carry. Many garden style hotels, hospitals, airports,

Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

.The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances,EmerodSelf propelled electric elevator, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, hydraulic control one-way valve, throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.


EmerodElectric mobile elevatorA bright spot in market demand



Construction electric elevators outside the lightning protection range

Precautions during operation: Mechanical operations should be gentle and smooth, and mechanical operations should be avoided, otherwise impact loads will inevitably occur, causing frequent mechanical failures and greatly shortening the service life. Generated during homework

The counterweight guide rail should meet the specification requirements.

High quality brand.Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements, but safety should be maintained.

During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed 50mm.


EmerodElectric mobile elevatorA bright spot in market demand



Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value,EmerodElectric portable elevator, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops

system.Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

A lifting platform with specifications ranging in height from 1 meter to 20 meters.

After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).


the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.

Manual pump: When the system malfunctions