KemonaElevator electric elevatorMagnetic particle detection technology

announcer:hp935HP175192871 release time:2024-01-21 13:05:14

Every theater is a public place with a large number of people, and safety considerations should be taken into account in stage design. According to relevant national regulations, in order to prevent accidents caused by the crushing of electric elevators or improper control by drivers. Electric elevators should be equipped with the following necessary safety devices to ensure that the car of the electric elevator stops rising or falling in a timely manner.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

Kemona.. The shutdown device (emergency stop switch) should be installed outside the ground protective fence; b) Pulley room (if any. Pulley room refers to a room where only pulleys or speed limiters and electrical equipment are installed; c) hanging cage top, if

Installation and dismantling personnel and drivers should hold certificates to work.

.Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.


KemonaElevator electric elevatorMagnetic particle detection technology



Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent

The noise of aluminum alloy electric elevators during operation is relatively low. If the noise is high, it is abnormal. Therefore, it is necessary to do a good job in troubleshooting, find the cause in a timely manner, reduce noise pollution, and reduce dangerous accidents

Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.

Statistics.As a material loading and unloading equipment recognized by customers in the lifting platform, the guide rail hydraulic lifting platform is superior in terms of product, civil engineering, and operating costs. The editor of the electric elevator will provide a detailed analysis: the advantages of the product are that the equipment bears a large load can achieve multiple points, and can be controlled up and down floors to achieve safe use.

Principle of electric elevator rotary valve: When the electric elevator rises, the rotary valve will automatically open. To close the plug valve, it is necessary to first turn the handle to turn the plug to a 90 degree position until it is closed, and then turn the transmission handwheel to lower the plug and achieve sealing.

The hydraulic oil forms a certain pressure by the vane pump, explosion-proof electromagnetic directional valve, hydraulic control one-way valve,KemonaSmall electric elevator, and balance valve, causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge. The downward movement of the hydraulic cylinder (i.e. lowering of heavy objects).


KemonaElevator electric elevatorMagnetic particle detection technology



The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

How many?.Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

Before use, we should observe whether there is any damage to the electric elevator. We can conduct a no-load test to raise and lower it. If there are any damaged parts, they should be replaced in a timely manner to prevent major accidents.

To ensure safe and reliable braking of the lifting platform and prevent accidents, a hydraulic control one-way valve, also known as a hydraulic lock, is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB1&flash; The rotation of the SB6 motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease,KemonaElectric automatic elevator, and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.

Kemona.The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer

The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed 8 degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions,KemonaElectric three wheel elevator, its calculation sheet design, and verified by experts.

Setting requirements: For construction electric elevators that operate in multiple shifts and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.