High lifting height, stable operation, noise free, easy maintenance,JiningElectric rope climbing machine elevator, and longer service life.

Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

Jining.The shutdown device (emergency stop switch) should be non automatic reset type.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, routine inspections should be carried out according to regulations and inspection records should be filled out.

Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.

Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.


JiningElectric portable elevatorExports continue to increase



As a material loading and unloading equipment recognized by customers in the lifting platform, the guide rail hydraulic lifting platform is superior in terms of product, civil engineering, and operating costs. The editor of the electric elevator will provide a detailed analysis: the advantages of the product are that the equipment bears a large load can achieve multiple points, and can be controlled up and down floors to achieve safe use.

The occurrence of.

When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

OK or not?.Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires,JiningElectric mobile hydraulic elevator,JiningElectric elevator cargo elevator, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed 4 ohms; The power supply of the electric elevator can be cut off.

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.

Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.


JiningElectric portable elevatorExports continue to increase



The verticality of the guide rail frame should meet the requirements of the specifications.

Workshop cost.The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

The suspension cage movement can only be resumed after operator operation.

Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.

Jining.Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

Before installation, the installation unit should confirm that the foundation, foundation bearing capacity embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

When the landing door is closed, the full width of the lifting passage opening should be covered.