BordeauxDouble fork hydraulic lifting platformWhat are the specifications of the size

announcer:hp530HP141750488 release time:2024-04-20 12:12:41

The hydraulic oil used in the system has the same brand,BordeauxChanging manual hydraulic lifting to electric hydraulic lifting, and the oil temperature is between 45~80 ℃. Use a large flow rate to remove impurities from the system as much as possible. The hydraulic system needs to be cleaned repeatedly three times or more, and after each cleaning,BordeauxHydraulic lifting platform fixed hydraulic, the system should be drained while the oil is hot. After cleaning, clean the filter and add new oil after using a new filter element.

The electromagnetic coil of the electromagnetic directional valve is not firmly fixed, and frequent separation and suction can also produce high noise.

Bordeaux.The machine room can be located within a radius of 15 meters of the shaft, occupying only 3-4 square meters. Professional improvement of quality assurance for aircraft manufacturers. The promotional activity is ongoing, and new and old customers are welcome to come for consultation

To consider its capacity, generally mobile equipment takes 2-3 times the high flow rate of pump Z, and fixed equipment takes 3-4 times.

.Load bearing capacity: The lifting platform is placed on a horizontal support surface and the workbench is evenly loaded to 125% of the maximum load capacity. After lifting 100 times, each load-bearing component must not have deformation or cracks.

When the hydraulic oil of the equipment is insufficient, it will not cause lifting. At this point, you only need to add enough hydraulic oil to run.

Pre install equipment, maintain unobstructed access roads and sufficient parking space before pre installation. Some hydraulic cargo elevators require heavy lifting assistance for installation, some require equipment such as forklifts for installation, and some can be pre installed manually. When it is necessary to install with the assistance of a truck crane and a forklift, there should be a device to make the workbench emergency descend.

What are the requirements for the pit? This type of cargo elevator only needs 15-30 centimeters and does not require too much space. The installation of scissor type hydraulic cargo elevators is different from that of guide rail type hydraulic cargo elevators. The scissor lift cargo elevator has a large load-bearing capacity, and the pit depth needs to be set at around 40-70 centimeters. It can also be designed according to customer on-site needs.

New reference wiring diagram 2. Elevator leg noise. Mobile elevators should open the legs before operation. In this case, if the legs lack butter noise will be generated.

Where can I find it?.When placing materials on the platform, they should be placed in the middle of the platform as much as possible. The weight of the goods should be within the standard load range of the equipment, and the volume of the goods should not exceed the platform size of the equipment. Otherwise, materials and lifting platforms may be injured and dangerous accidents may occur. High priced and various specifications of elevator manufacturers provide timely supply, with high cost-effectiveness, and have become the preferred brand for many wire products. Welcome to purchase!

After the pre installation is completed, the pre installed equipment should be fixed, and the positions of cables, oil pipes, and components such as the pre installed frame should be confirmed to be correct before reinforcement work can be carried out. Reinforcement requires welding or screws, and the hydraulic cargo elevator after reinforcement has robustness and safety.

The lifting platform is placed on a horizontal support surface,BordeauxSmall hydraulic lifting platform, and the concentrated load of MAX load capacity is placed at any position 300mm away from the periphery of the workbench. After lifting 100 times, each load-bearing component must not have deformation or cracks.


BordeauxDouble fork hydraulic lifting platformWhat are the specifications of the size



The lifting platform is placed on a horizontal support surface, each load-bearing component must not have deformation or cracks.

Direct material.Volume speed control circuit: Speed control is achieved by adjusting the displacement of a variable pump or variable motor.

Ensure a good power supply at the installation site, install a separate distribution box, and when using the distribution box the electrical leakage switch must meet the requirements for construction elevators. If the installed construction elevator is variable frequency, the leakage switch should be compatible with the frequency converter when selecting it.

The hydraulic pump produces noise. When the hydraulic elevator rises, the hydraulic pump runs at high speed. If there is a problem with the gears or bearings of the hydraulic pump, which causes periodic changes in the hydraulic system pressure, it will also cause resonance in the hydraulic system and generate noise.

Bordeaux.Protective device: In case of power or oil circuit failure, there should be a safety rope to prevent the workbench from falling out of control. (Allow controlled descent)

Volume speed control circuit: Speed control is achieved by adjusting the displacement of a variable pump or variable motor.

Users should arrange dedicated personnel to operate hydraulic elevators, formulate usage details and safety precautions for hydraulic elevators based on their own situation