Gu YeSelf propelled hydraulic lifting platformShowcase of craftsmanship

announcer:hp530HP141750488 release time:2024-03-23 10:18:53

To consider its capacity, generally mobile equipment takes 2-3 times the high flow rate of pump Z, and fixed equipment takes 3-4 times.

The electromagnetic coil of the electromagnetic directional valve is not firmly fixed,Gu YeDouble fork hydraulic lifting platform, and frequent separation and suction can also produce high noise.

Gu Ye.All high-altitude operations must first build scaffolding or take measures to prevent teams from falling before boarding the vehicle bridge.

Solution: Check if the performance of the legs is good, even if the butter is polished to increase its properties.

.The classification of lifting platforms is as follows: they are divided into mobile lifting platforms, automatic lifting platforms, hydraulic lifting platforms folding arm lifting platforms, and sleeve type lifting platforms according to their different modes of movement.

There is air in front of the pilot valve of the elevator overflow valve noise overflow valve. The damping hole on the main valve core of the overflow valve is blocked by oil dirt, and the pilot valve and valve seat are matched without spring deformation or incorrect installation. The remote control port has excessive oil flow, low or high hydraulic oil viscosity, and resonance occurs with components in the circuit. Troubleshooting: Strengthen sealing, exhaust and clean the valve body several times, Make the damping hole unobstructed, repair or replace the spring, reduce the flow of the remote control port, and other components. The pressure setting of other components should not be similar to the pressure setting of the relief valve. 5. The noise of the elevator pipeline is usually caused by excessive dead bends or loose fixed sleeves in the hydraulic pipeline.

Regularly inspect the hydraulic lifting equipment of the upper and lower materials to ensure the safety of the rail type elevator and the safety of the material supply to the rail type lifting platform.


Gu YeSelf propelled hydraulic lifting platformShowcase of craftsmanship



For hydraulic cylinders in hydraulic elevators, it is not practical to change their effective working area A (equivalent to displacement) to adjust the speed. Generally, the speed can only be adjusted by changing the flow rate. For variable displacement motors, use a pad iron under the base screws to increase the force surface between the nut and the floor, in order to reduce the impact of the nut on the floor; Insert steel plate gaskets of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite; After adjusting the verticality of the guide rail frame,Gu YeHydraulic lifting platform Electric lifting platform, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and press it tightly

Reason: The lowering speed valve is out of adjustment. Cleaning method: If the lowering speed valve is adjusted, and if the adjustment is ineffective, replace it with a new valve.

Lets see.After 5000 hours of elevator operation, carry out medium maintenance on the mechanical and electrical systems.

Before installation, the installation personnel should confirm the infrastructure such as the foundation and shaft, pay attention to alignment, leveling, and alignment points, and confirm that the foundation meets the requirements before construction.

The lifting platform is a multifunctional heavy loading and unloading mechanical equipment, which can be divided into fixed and mobile, guide rail and curved arm types. Fixed types include scissor elevators chain elevators, and attached electric construction platforms.


Gu YeSelf propelled hydraulic lifting platformShowcase of craftsmanship



Therefore loading and unloading platforms, in the hydraulic pipeline assembly line, it is necessary to avoid dead bends as much as possible and check the tightness of the sleeve in a timely manner.

Industry management.The manufacturer of hydraulic cargo elevators reminds the use of guide rail hydraulic lifting cargo elevators. Guide rail hydraulic lifting cargo elevators: Do not stand within the specified range, draw on the guide rail lifting platform, prohibit any idle personnel from entering the work area, ensure that the work area is free of clothing, and maintain a clean and tidy workplace.

Oil pipe leaks oil. Poor sealing of oil pipes, oil leakage, resulting in a decrease in pressure and a natural descent of hydraulic cargo elevators. It is recommended to carefully check whether the oil pipes are intact and undamaged.

Vehicle mounted lifting platform is widely used for high-altitude operations in hotels, buildings, stations, sports venues, workshops,Gu YeSelf propelled hydraulic lifting platform, warehouses, and other places; It can also be used as temporary high-altitude lighting, advertising, etc.

Gu Ye. There is air in front of the pilot valve of the elevator overflow valve noise overflow valve. The damping hole on the main valve core of the overflow valve is blocked by oil dirt, and the pilot valve and valve seat are matched without spring deformation or incorrect installation. The remote control port has excessive oil flow, low or high hydraulic oil viscosity and resonance occurs with components in the circuit. Troubleshooting: Strengthen sealing, repeatedly adjust the pressure, exhaust and clean the valve body several times, Make the damping hole unobstructed, repair or replace the spring, reduce the flow of the remote control port, replace the oil, and other components. The pressure setting of other components should not be similar to the pressure setting of the relief valve. 5. The noise of the elevator pipeline is usually caused by excessive dead bends or loose fixed sleeves in the hydraulic pipeline.

Each box, distribution box, etc. should be kept clean and promptly cleaned of dust on electrical equipment.

The lifting platform is placed on a horizontal support surface, and the concentrated load of MAX load capacity is placed at any position 300mm away from the periphery of the workbench. After lifting 100 times, each load-bearing component must not have deformation or cracks.