Vaninen30 meter elevatorThe low rebound performance is commendable

announcer:hp323HP155335083 release time:2024-01-09 10:25:02

The elevator has a strong load-bearing capacity and is suitable for two people (who can carry a certain amount of weight tools and materials) to climb high at the same time; Various non-standard products can also be customized according to different environments to meet different needs.

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).

Vaninen.Aluminum alloy elevators, also known as aluminum alloy lifting platforms, currently have a wide variety in the Chinese market. They are highly favored by users due to their flexible movement, light weight, fire and high temperature resistance good waterproof performance, strong overload capacity, corrosion resistance, radiation resistance, and long service life

.The hydraulic lifting platform mainly uses hydraulic oil pressure transmission to achieve the lifting function. Its shear fork mechanical structure provides stability for the lift. The wide working platform and high bearing capacity make the high-altitude operation range wide and suitable for multiple people to work simultaneously. It makes high-altitude operations efficient and guaranteed.

When working at heights exceeding 1.5 meters, safety nets or safety belts must be used.

Elevating platform price elevators and elevating platforms are used for large-scale high-altitude continuous operations such as airport terminals, aircraft repairs, stations, docks, shopping malls sports venues, factories and mining workshops. Some products have the function of active walking residential properties, allowing for fast and slow walking under different operating conditions. With just one person in the air, the machine can be operated to complete actions such as up and down, moving, retreat, and turning. When the machine is in a suspended state, the wheels are always in a braking state and can firmly brake on a 6 degree slope. The large diameter and ultra wide high-quality rubber wheels provide users with useful maintenance on the ground and increase the friction force during braking.


Vaninen30 meter elevatorThe low rebound performance is commendable



Gear pump worn, aged or damaged; The solution is to replace the gear pump. Professional elevator manufacturers have advanced technology, strict testing, more affordable prices, and more discounts. Welcome to consult

Ensure excellent power supply at the installation site, install a separate distribution box, and the electrical leakage switch must meet the requirements for construction elevators when using the distribution box. If the installed construction elevator is variable frequency, the leakage switch should be compatible with the frequency converter when selecting it.

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, dirt and dust, especially the air, fuel and oil filter of the engine should be checked and cleaned according to the specified time to prevent impurities from entering the cylinder and oil passage, so as to accelerate the wear of moving parts. Elevator manufacturers suggest developing some maintenance systems. The regular maintenance system is based on the wear and service life of mechanical components, as well as the wear and tear patterns of oil and liquid. The maintenance system mainly determines the maintenance needs of the machinery based on the operating hours of the machinery, which has also become the planned expected maintenance system.

High altitude work requires the use of tool bags, and heavier and larger high-altitude work tools should be hung on stable components and cannot be placed randomly to avoid the occurrence of high-altitude falling accidents.

Outriggers: mechanical outriggers, hydraulic outriggers, ordinary hand cranked outriggers, and pull-out outriggers. Professional elevator manufacturer with large quantity and excellent quality at a reasonable price. Fire resistant, high temperature resistant sturdy and durable, safe and reliable


Vaninen30 meter elevatorThe low rebound performance is commendable



The oil filter is severely blocked; The solution is to clean the oil filter or replace the hydraulic oil. Professional elevator manufacturers guarantee quality, service,VaninenSingle mast aluminum alloy elevator, and quality. Your satisfaction is our pursuit! Welcome to inquire by phone

production costs.Drain all the hydraulic oil in the oil tank, open the oil tank, take out the oil suction filter,VaninenChain elevator lifting platform,VaninenSmall elevator within 2000 yuan, clean it, and return it to the oil tank. Install it in its original position. Fill the fuel tank with new oil.

Aluminum alloy elevators, also known as aluminum alloy lifting platforms, currently have a wide variety in the Chinese market. They are highly favored by users due to their flexible movement, light weight, and small size.

Systems: explosion-proof electronic control system, remote control system, and PIC system. Professional elevator manufacturers have stable, reliable performance, and can achieve maintenance free. Their technical level has reached the domestic level and reached the advanced level of similar international products

Vaninen.Check the hydraulic oil quality and level. When the lifting platform is raised to a high position, the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.

During the use of hydraulic elevators, if not properly operated there will always be problems. Many customers have reported that hydraulic elevators sometimes cannot be lifted. If the hydraulic lift pump can continue to work, other issues need to be considered. Below, the editor will explain the reasons for the hydraulic lift pump station not being oiled and solve the reasons for the hydraulic lift pump station not being oiled, as well as the solutions for mobile elevators The analysis of the pump station of hydraulic elevators such as guide rail elevators is as follows: the motor power supply is abnormal or reversed; The solution is to correctly connect the motor power supply or adjust the steering mailbox to ensure there is no hydraulic oil or insufficient oil; The solution is to add hydraulic oil.

Check the hydraulic oil quality and level. When the lifting platform is raised to a high position, the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.