Wichito2 ton elevatorWhat is the benefit if you complete the work in one go?

announcer:hp323HP155335083 release time:2023-12-22 10:29:27

Staying below high-altitude work sites is prohibited, and safety nets or other protective devices should be installed below the work site to avoid injury from falling objects.

The loading and unloading mobile boarding bridge has become a very common structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and turnover products and goods. The height of the loading and unloading operation platform is fixed, whether it is a scissor type lifting platform or a guide rail type lifting cargo elevator full consideration should be given to whether the on-site environment meets the operating conditions of the crane.

The power unit adjustment, is composed of the power unit and the oil cylinder. The power unit has four outlets during production, which can be adjusted to increase or decrease the hydraulic oil flow rate of the oil cylinder. We can adjust the motor speed or the electro-hydraulic proportional valve to adjust the hydraulic oil flow rate; What factors will affect the lifting speed of hydraulic elevators? The longer the hydraulic oil pipe, the longer the lifting time. Therefore, during installation, the length of the oil pipe should be minimized as much as possible within the allowable range of the design; On the basis of adjusting the power unit, the size of the oil pipeline can also be adjusted, and corresponding adjustments can be made while ensuring that the equipment meets normal demand and safety.

.The hook of the seat belt should not be hung on unstable or moving objects.

Loose or leaking connection between the oil suction pipe and the gear pump; The solution is to tighten the suction pipe.

What is the solution to the problem of surface rust on the spiral elevator? The deficiency is that sandpaper has a significant loss on the spiral elevator itself.


Wichito2 ton elevatorWhat is the benefit if you complete the work in one go?



The method is that it may cause increased wear and inflexibility of the parts,WichitoConstruction site material elevator, and it is also important to pay attention to the installation precautions corresponding to the working environment and not be careless. Proper installation, use, and maintenance of elevators are important steps to ensure the normal operation of mechanical equipment. Therefore, when installing the elevator, please be sure to strictly follow the installation and use related matters below, and carefully assemble and use it.

The question of how to extend the service life of hydraulic lifting platforms will be briefly discussed here. Many people may not be familiar with this type of equipment, especially those who do not know which factories are producing such equipment. It is recommended that friends can search online because many companies selling and producing this type of equipment now have their own official websites, There is a more detailed introduction on maintenance and upkeep knowledge online, and the paint of elevators is not only a beautiful layer; Clothing&# quo;, It is also the primary protective layer. Paint can isolate the air, avoid direct contact between steel and air, and slow down the progress of corrosion. However, there are some common knowledge that you are not aware of. Next, be cheap, and not greedy. We cannot demand quality, only price. For example, Chenhong, and others are trustworthy brands; Apply anti rust paint directly after shot peening. Suitable for general mineral oils and hydraulic fluids, not suitable for aqueous hydraulic fluids. Due to not being constrained by the conditions of handling elevators, large elevators often choose this acid pickling and phosphating method. Suitable for all media, but constrained by acid pickling and phosphating tanks the elevator cannot be too large; Sand blasting and plastic spraying. Suitable for all media elevators, but restricted by drying equipment, the lifting channel cannot be too large;

Introduction to Fixed Boarding Bridge Loading and unloading Mobile Boarding Bridge is a very common structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to quickly enter and exit transportation vehicles for loading and unloading operations.

analysis.When working at heights exceeding 1.5 meters, safety nets or safety belts must be used.

The set pressure of the elevator price regulating valve is insufficient; The solution is to adjust the pressure valve. Professional elevator manufacturers have high pressure resistance, good waterproof performance, fire and high temperature resistance,WichitoRestaurant elevator, strong overload capacity, corrosion resistance, radiation resistance, and long service life

Check the hydraulic oil quality and level. When the lifting platform is raised to a high position the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged,WichitoRigid chain elevator, it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.


Wichito2 ton elevatorWhat is the benefit if you complete the work in one go?



The hydraulic lifting platform mainly uses hydraulic oil pressure transmission to achieve the lifting function. Its shear fork mechanical structure provides stability for the lift. The wide working platform and high bearing capacity make the high-altitude operation range wide and suitable for multiple people to work simultaneously. It makes high-altitude operations efficient and guaranteed.

Price.Four column aluminum alloy elevator: the whole elevator is made of high-strength aluminum profiles. Due to the high strength of the profiles, the four mast structure is adopted, which has excellent stability, flexible operation, large load capacity, large platform area and convenient implementation. Its appearance allows for high lifting capacity in extremely small spaces. Minimize the deflection of the lifting platform.

A large logistics warehousing equipment service company directly operated by manufacturers with guaranteed prices and guaranteed services. Due to the fact that fixed elevators are mechanical equipment, the product quality and performance are good. Do not accept products from some manufacturers that do not meet the quality standards to avoid potential safety hazards during use.

When conducting high-altitude operations on dangerous edges such as roofs, suspension bridges, slopes, or cliffs, guardrails or safety nets should be installed on the side facing the air, or safety belts or ropes should be used.

Wichito.Hydraulic pump station: domestic lifting platform dedicated pump station, Italian imported pump station with external protective devices: organ m type, mesh type, and iron plate sealed type.

4: Small scale pneumatic or electric rust removal is based on the principle of using air compression to generate friction or electromagnetic effects to polish and remove rust on the surface of spiral elevators. It can be used for precision instrument push rods or for enterprises that require micro operation of spiral elevators.

The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.