El Prague30 meter elevatorOriented function

announcer:hp323HP155335083 release time:2023-12-21 12:25:05

elevators are widely used and are involved in many industries. The spiral elevator is no exception and has a very good effect. But sometimes the surface of the spiral elevator will rust, which has a certain impact on work efficiency and needs to be removed. So what is the solution to the surface rust of the spiral elevator?

The load capacity of goods and the tonnage of goods transported at once also affect the speed of lifting and lowering. Achieving the excellent value of the lifting platform for transporting goods is a guarantee of speed. If the weight is too heavy, it affects the speed. If the goods are too light, it also affects the normal transportation time.

El Prague.At this point, if the high-altitude work platform is overloaded, it may cause damage to the components and cause some mechanical failures.

The elevator has a strong load-bearing capacity and is suitable for two people (who can carry a certain amount of weight tools and materials) to climb high at the same time; Various non-standard products can also be customized according to different environments to meet different needs.

.For the safety performance of high-altitude work platforms, and strict management to ensure production. When in use, people, the environment, and machines are the three major links of high-altitude operations and safety is the basic condition to ensure the smooth progress of high-altitude operations. In the following text, Jiuyi briefly describes the precautions for using high-altitude operation platforms: high-altitude operators must hold a health certificate. Individuals with mental illness,El PragueElectric vegetable elevator, hypertension, or mental illness are not allowed to engage in high-altitude work tasks. Staff are not allowed to engage in high-altitude work while drinking alcohol or feeling mentally drained.

Use a heavy crane to lift the cage and accurately position it from above the standard section; Place the two suspension cages on the guide rail frame and slowly place them on the buffer spring. Prepare the drive frames of the two suspension cages and adjust each back wheel and roller to a position with a large gap to facilitate the installation of the drive frame. Install a standard section on the basic part of the elevator using heavy equipment and tighten the connecting bolts. Install two sets of drive frames above each suspension cage using heavy equipment and thread the connecting pins, and install the cage top guardrail.

Three column aluminum alloy elevator: Three sets of masts support the synchronous lifting of the working platform, and the support structure is the same as that of a single masted platform, with super large load capacity and work stability. The overall lifting guardrail device has good strength and greatly reduces the height of the entire machine during transportation. It is very convenient for loading and unloading, and can be assembled or disassembled in one lift.


El Prague30 meter elevatorOriented function



Fixed boarding bridge: A fixed boarding bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods. Its height adjustment function uses a bridge between the truck and the cargo platform in the warehouse, and forklifts and other vehicles to move and batch goods inside the truck

Before use, carefully check the grounding wire, safety devices, buffer springs, etc. Ensure a safe usage environment.

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).

resources.Use a heavy crane to lift the cage and accurately position it from above the standard section; Place the two suspension cages on the guide rail frame and slowly place them on the buffer spring. Prepare the drive frames of the two suspension cages and adjust each back wheel and roller to a position with a large gap to facilitate the installation of the drive frame. Install a standard section on the basic part of the elevator using heavy equipment and tighten the connecting bolts. Install two sets of drive frames above each suspension cage using heavy equipment and thread the connecting pins, and install the cage top guardrail.

Systems: explosion-proof electronic control system, remote control system, and PIC system. Professional elevator manufacturers have stable,El PragueConstruction site elevator, safe, reliable performance, and can achieve maintenance free. Their technical level has reached the domestic level and reached the advanced level of similar international products

Curved arm elevator: a lifting device used for high-altitude operations, which can cross obstacles for high-altitude operations. When the platform is lifted to any position, it can operate while walking with a compact structure and flexible turning. The width of its site can ensure that the equipment enters narrow passages and crowded working areas. The backup power device can operate the work platform to reset, blow the valve core clean with compressed air and is a convenient transportation method that can be towed to any place.


El Prague30 meter elevatorOriented function



Remove and disassemble the lowering valve, and then reinstall it.

Total quality management.Unscrew the screws on the dustproof hole on the outer side of the elevator flange, adjust the PCS system ring to align its side hole with the dustproof hole, and tighten the inner hexagon. Afterwards, remove the motor shaft key.

Precautions for elevator installation: Keep the access road of external construction elevators smooth and have sufficient parking space for equipment. When using a crane for auxiliary installation, full consideration should be given to whether the on-site environment meets the operating conditions of the crane.

The size of the oil cylinder should be minimized as much as possible while meeting the design requirements. The smaller the size of the oil cylinder, the faster the lifting speed.

El Prague.The advantages and application fields of elevators and lifting platforms. The lifting mechanism is made of high-strength manganese steel giant tubes. Equipped with safety maintenance equipment to avoid overloading of elevators. Equipped with a safety maintenance valve to prevent hydraulic pipeline cracking. Equipped with emergency lowering equipment in case of power outage. This product is suitable for mobile high-altitude operations such as high-altitude equipment and maintenance in various industries.

The power unit adjustment, whether it is a scissor type lifting platform or a guide rail type lifting cargo elevator,El Prague12 meter mobile elevator, is composed of the power unit and the oil cylinder. The power unit has four outlets during production, which can be adjusted to increase or decrease the hydraulic oil flow rate of the oil cylinder. We can adjust the motor speed or the electro-hydraulic proportional valve to adjust the hydraulic oil flow rate; What factors will affect the lifting speed of hydraulic elevators? The longer the hydraulic oil pipe, the longer the lifting time. Therefore during installation, the length of the oil pipe should be minimized as much as possible within the allowable range of the design; On the basis of adjusting the power unit, and corresponding adjustments can be made while ensuring that the equipment meets normal demand and safety.

Characteristics of hydraulic elevators: Hydraulic lifting platform products are divided into curved arm hydraulic lifting machines, scissor fork hydraulic lifting machines, mast hydraulic elevators, and straight arm hydraulic elevators according to their working modes. Hydraulic elevator is a replacement product of folding arm elevator (lifting platform) and scissor fork elevator (lifting platform). It can be widely used for the decoration and decoration of stations, docks, airports, hotels, posts and telecommunications, municipal gardens, garages, cleaning companies, public building facades, or the installation and maintenance of power systems, etc. This elevator has the advantages of light weight, self-propelled walking, electric starting, self supporting legs, simple operation, large working area, and especially the ability to cross obstacles for high-altitude operations.