RotlingenConstruction site cargo elevator elevatorBe careful when using these points

announcer:hp323HP155335083 release time:2023-12-19 12:43:22

Outriggers: mechanical outriggers, hydraulic outriggers, ordinary hand cranked outriggers, and pull-out outriggers. Professional elevator manufacturer with large quantity and excellent quality at a reasonable price. Fire resistant, waterproof high temperature resistant, sturdy and durable, safe and reliable

Staying below high-altitude work sites is prohibited, and safety nets or other protective devices should be installed below the work site to avoid injury from falling objects.

Rotlingen.How to use a hydraulic elevator and whether the emergency stop device is effective is very important during use. If special circumstances arise, the emergency stop can be used. Therefore, before use, it is necessary to carefully check whether all items are normal and ensure the effectiveness of the braking device.

Three column aluminum alloy elevator: Three sets of masts support the synchronous lifting of the working platform, and the support structure is the same as that of a single masted platform,Rotlingen500 kg small automatic elevator, with super large load capacity and work stability. The overall lifting guardrail device has good strength and greatly reduces the height of the entire machine during transportation. It is very convenient for loading and unloading, and can be assembled or disassembled in one lift.

.When conducting high-altitude operations on dangerous edges such as roofs, suspension bridges, slopes, or cliffs, guardrails or safety nets should be installed on the side facing the air or safety belts or ropes should be used.

Hydraulic lifting platforms are widely used in factory maintenance, municipal construction, and decoration of hotels in industrial and mining enterprises, with reliable quality and perfect performance.

The size of the oil cylinder should be minimized as much as possible while meeting the design requirements. The smaller the size of the oil cylinder, the faster the lifting speed.


RotlingenConstruction site cargo elevator elevatorBe careful when using these points



High altitude work requires the use of tool bags, and heavier and larger high-altitude work tools should be hung on stable components and cannot be placed randomly to avoid the occurrence of high-altitude falling accidents.

Ensure excellent power supply at the installation site, install a separate distribution box,Rotlingen12 meter elevator, and the electrical leakage switch must meet the requirements for construction elevators when using the distribution box. If the installed construction elevator is variable frequency, the leakage switch should be compatible with the frequency converter when selecting it.

Before connecting the motor to the elevator, the elevator manufacturer should first make the motor shaft keyway perpendicular to the tightening bolt. To ensure uniform force, please first screw on the installation bolts at any diagonal position, but do not tighten them. Then, screw on the installation bolts at the other two diagonal positions and tighten the four installation bolts one by one. Afterwards, with a wide operating range and high load-bearing capacity, with labor-saving operation and flexible movement. It can cross obstacles such as fixed seats with a height of up to 1m, and can operate stably on steps. Made of high-strength rectangular steel pipes, with good rigidity and stability. Equipped with universal casters for flexible mobility. The span of the two end brackets can be adjusted, which is suitable for crossing different obstacles. The two end brackets are vertically adjustable and can be used for operations on slopes or steps with a certain slope.

The loading and unloading mobile boarding bridge has become a very common structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and turnover products and goods. The height of the loading and unloading operation platform is fixed, and safety nets or other protective devices should be installed below the work site to avoid injury from falling objects.


RotlingenConstruction site cargo elevator elevatorBe careful when using these points



High altitude work is now also very common, and elevators are also highly demanded by the market. Many high-rise transportation tasks are completed by elevators, with high efficiency and reassuring safety. However, otherwise there may be problems, and no one wants to see such a situation happen. What are the installation precautions for elevators?

install.Systems: explosion-proof electronic control system, remote control system, and PIC system. Professional elevator manufacturers have stable, safe, reliable performance, and can achieve maintenance free. Their technical level has reached the domestic level and reached the advanced level of similar international products

The concept of hydraulic boarding bridge is the power system of the boarding bridge. The large oil cylinder lifts the entire equipment inclined plate. When it is raised to a large height the small oil cylinder begins to operate, extending the hinge tongue plate. All equipment plates are made of high-quality high height patterned steel plates and profiles, which are effectively welded and have a long service life.

The purpose of the hydraulic lifting platform allows users to choose the power mode and configuration according to their own usage range: the power system includes: DC power supply, single-phase or three-phase power supply, diesel engine.

Rotlingen.1: The rust on the spiral elevator is caused by some manufacturers' materials not being stainless steel. If rust is not severe,RotlingenScissor lift, sandpaper can be used to polish and remove the rust. Professional improvement of quality assurance for aircraft manufacturers. The promotional activity is ongoing, and new and old customers are welcome to come for consultation

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).

Emergency bolts not tightened; The solution is to tighten the emergency valve.