HanshanElectric hydraulic elevator 15 metersWhat are the main categories

announcer:hp323HP155335083 release time:2024-04-10 09:04:38

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).

Introduction to Fixed Boarding Bridge Loading and unloading Mobile Boarding Bridge is a very common structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and turnover products and goods. The height of the loading and unloading operation platform is fixed,Hanshan10 meter fully automatic elevator, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to quickly enter and exit transportation vehicles for loading and unloading operations.

Hanshan.Prepare the foundation according to the basic plan,HanshanRail cargo elevator, pay attention to finding, and aligning points, and ensure the level of the foundation and various usage requirements.

This series of products has a load capacity of 0.1 to 0.8 tons, and can also be customized according to user requirements, with a load capacity of up to 10 tons.

.High altitude work requires the use of tool bags, and heavier and larger high-altitude work tools should be hung on stable components and cannot be placed randomly to avoid the occurrence of high-altitude falling accidents.

The normally closed valve and motor are energized simultaneously; The solution is correct wiring, and the motor often closes the valve and loses power when powered on.

Outriggers: mechanical outriggers, hydraulic outriggers, ordinary hand cranked outriggers and pull-out outriggers. Professional elevator manufacturer with large quantity and excellent quality at a reasonable price. Fire resistant, waterproof, high temperature resistant, sturdy and durable, safe and reliable


HanshanElectric hydraulic elevator 15 metersWhat are the main categories



3: High pressure water abrasive rust removal. A type of spiral elevator that utilizes the impact of high-pressure water jet and abrasive to polish and remove rust, with the advantage of minimal material damage. However, water can cause certain damage to electronic equipment, making it suitable for detachable types of spiral elevators.

Precautions for elevator installation: Keep the access road of external construction elevators smooth and have sufficient parking space for equipment. When using a crane for auxiliary installation, full consideration should be given to whether the on-site environment meets the operating conditions of the crane.

The method is that it may cause increased wear and inflexibility of the parts, and it is also important to pay attention to the installation precautions corresponding to the working environment and not be careless. Proper installation, use, and maintenance of elevators are important steps to ensure the normal operation of mechanical equipment. Therefore, when installing the elevator, please be sure to strictly follow the installation and use related matters below, you should follow the following two principles: good electrical parameters; During the movement of the cable with the elevator, there will be a section in the middle that undergoes bending deformation due to gravity, causing changes in electrical parameters such as impedance and distributed capacitance of the cable. Poor quality cables have significant parameter changes when subjected to force deformation,

Loose or leaking connection between the oil suction pipe and the gear pump; The solution is to tighten the suction pipe.

The normally closed valve and motor are energized simultaneously; The solution is correct wiring, and the motor often closes the valve and loses power when powered on.


HanshanElectric hydraulic elevator 15 metersWhat are the main categories



Single column aluminum alloy elevator with easily recognizable operation panel, multiple mechanical, electrical, and hydraulic safety protection, and advanced integrated hydraulic electricity

Project scope.Nowadays, elevators are widely used and are involved in many industries. The spiral elevator is no exception and has a very good effect. But sometimes the surface of the spiral elevator will rust, effectively reducing the torsion of the frame, and has stronger durability.

The hook of the seat belt should not be hung on unstable or moving objects.

Hanshan.The boarding bridge can be divided into two forms: a mobile boarding bridge and a fixed boarding bridge. A brief introduction to the application scope of a fixed boarding bridge and the use of a mobile boarding bridge: used in places without loading and unloading platforms or where mobile loading and unloading of goods are required. If there is no loading and unloading platform at the logistics site as a remedial measure, and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

According to different needs a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope, different power modes can be selected, such as three-phase AC power supply, single-phase AC power supply, DC power supply, and internal combustion power supply. With manual hydraulic equipment, lifting operations can be carried out in places with power outages or no power supply, and components can be added. When the platform length is insufficient, it can be extended to the required direction, and then the operating power can be increased. It is a must-have product of modern large-scale construction and equipment, and a necessity for high-altitude safety and civilized production.

According to different needs, different power modes can be selected,Hanshan12 meter mobile elevator, such as three-phase AC power supply single-phase AC power supply, DC power supply, and internal combustion power supply. With manual hydraulic equipment, lifting operations can be carried out in places with power outages or no power supply, it can be extended to the required direction, and then the operating power can be increased. It is a must-have product of modern large-scale construction and equipment, and a necessity for high-altitude safety and civilized production.