Larosh on the Yonghe River10 meter elevatorWhat's the market

announcer:hp323HP155335083 release time:2024-03-07 11:24:30

Check the rollers, intermediate shafts, and bearings; Oil cylinder pin and bearing; Equality and wear of the hinge shaft and bearings of the boom; Add oil to the above components for maintenance of outdoor elevators and factory elevators. Extend the service life of bearings.

Three column aluminum alloy elevator: Three sets of masts support the synchronous lifting of the working platform, and the support structure is the same as that of a single masted platform, with super large load capacity and work stability. The overall lifting guardrail device has good strength and greatly reduces the height of the entire machine during transportation. It is very convenient for loading and unloading, and can be assembled or disassembled in one lift.

Larosh on the Yonghe River.The anti-corrosion measures for the body of high-altitude work vehicles should pay attention to small scratches. The paint surface of high-altitude work vehicles often corrodes. In addition to common collisions, scratches, and small rocks on the driving tires, there can also be a peeling point, which will cause a small rust over time. Because most of these scars are small and easily overlooked. Therefore regular inspections should be conducted on the engine hood and surrounding areas. Once discovered, it is necessary to promptly go to a professional beauty shop for processing.

This series of products has a load capacity of 0.1 to 0.8 tons, and can also be customized according to user requirements, with a load capacity of up to 10 tons.

.Drain all the hydraulic oil in the oil tank,Larosh on the Yonghe River13 meter elevator, open the oil tank, take out the oil suction filter, clean it, and return it to the oil tank. Install it in its original position. Fill the fuel tank with new oil.

Check the rollers, intermediate shafts, and bearings; Oil cylinder pin and bearing; Equality and wear of the hinge shaft and bearings of the boom; Add oil to the above components for maintenance of outdoor elevators and factory elevators. Extend the service life of bearings.

The cleaning of the elevator manufacturer requires that all parts of the elevator should be kept free of oil sludge dirt and dust, especially the air, fuel and oil filter of the engine should be checked and cleaned according to the specified time to prevent impurities from entering the cylinder and oil passage, so as to accelerate the wear of moving parts. Elevator manufacturers suggest developing some maintenance systems. The regular maintenance system is based on the wear and service life of mechanical components, as well as the wear and tear patterns of oil and liquid. The maintenance system mainly determines the maintenance needs of the machinery based on the operating hours of the machinery, which has also become the planned expected maintenance system.


Larosh on the Yonghe River10 meter elevatorWhat



The set pressure of the elevator price regulating valve is insufficient; The solution is to adjust the pressure valve. Professional elevator manufacturers have high pressure resistance, fire and high temperature resistance, strong overload capacity, corrosion resistance,Larosh on the Yonghe RiverElevator small conveyor, radiation resistance, and long service life

The concept of hydraulic boarding bridge is the power system of the boarding bridge. The large oil cylinder lifts the entire equipment inclined plate. When it is raised to a large height, the small oil cylinder begins to operate, extending the hinge tongue plate. All equipment plates are made of high-quality high height patterned steel plates and profiles, which are effectively welded and have a long service life.

Walking: assisted self-propelled, two wheel traction self driving, and car modification.

total cost.What is the solution to the problem of surface rust on the spiral elevator? The deficiency is that sandpaper has a significant loss on the spiral elevator itself.

According to different needs, different power modes can be selected, such as three-phase AC power supply, single-phase AC power supply, and internal combustion power supply. With manual hydraulic equipment, lifting operations can be carried out in places with power outages or no power supply, and components can be added. When the platform length is insufficient,Larosh on the Yonghe River30 meter elevator, it can be extended to the required direction, and then the operating power can be increased. It is a must-have product of modern large-scale construction and equipment, and a necessity for high-altitude safety and civilized production.

The boarding bridge can be divided into two forms: a mobile boarding bridge and a fixed boarding bridge. A brief introduction to the application scope of a fixed boarding bridge and the use of a mobile boarding bridge: used in places without loading and unloading platforms or where mobile loading and unloading of goods are required. If there is no loading and unloading platform at the logistics site, as a remedial measure, a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).

new product.The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.

Ensure excellent power supply at the installation site, install a separate distribution box, and the electrical leakage switch must meet the requirements for construction elevators when using the distribution box. If the installed construction elevator is variable frequency, the leakage switch should be compatible with the frequency converter when selecting it.

Gear pump worn, aged or damaged; The solution is to replace the gear pump. Professional elevator manufacturers have advanced technology, more affordable prices and more discounts. Welcome to consult

Larosh on the Yonghe River.Reset the brake; Installation and maintenance section. The maintenance section is generally installed in the fourth section. Long term promotion of downgrading manufacturers, 20 year old brand, with price advantages and guaranteed quality!

Preparation before folding and installation of the elevator. Carefully prepare a special construction plan for installation and provide safety technical disclosure to the installation personnel.

Unscrew the screws on the dustproof hole on the outer side of the elevator flange, adjust the PCS system ring to align its side hole with the dustproof hole, and tighten the inner hexagon. Afterwards, remove the motor shaft key.