HagueWorkshop operation elevatorIt is better to maintain a biased operation idea

announcer:hp323HP155335083 release time:2024-02-18 11:53:18

Hydraulic pump station: domestic lifting platform dedicated pump station, Italian imported pump station with external protective devices: organ m type, mesh type, and iron plate sealed type.

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).

Hague.Aluminum alloy elevators, also known as aluminum alloy lifting platforms, currently have a wide variety in the Chinese market. They are highly favored by users due to their flexible movement, light weight, and small size.

The operation of the single column aluminum alloy elevator is relatively convenient. The gantry is easy to assemble across the frame, with labor-saving operation and flexible movement. It can cross obstacles such as fixed seats with a height of up to 1m, and can operate stably on steps. Made of high-strength rectangular steel pipes, with good rigidity and stability. Equipped with universal casters for flexible mobility. The span of the two end brackets can be adjusted, which is suitable for crossing different obstacles. The two end brackets are vertically adjustable and can be used for operations on slopes or steps with a certain slope.

.The cleaning of the elevator manufacturer requires that all parts of the elevator should be kept free of oil sludge, dirt and dust, especially the air,Hague6-meter small elevator, fuel and oil filter of the engine should be checked and cleaned according to the specified time to prevent impurities from entering the cylinder and oil passage, so as to accelerate the wear of moving parts. Elevator manufacturers suggest developing some maintenance systems. The regular maintenance system is based on the wear and service life of mechanical components, as well as the wear and tear patterns of oil and liquid. The maintenance system mainly determines the maintenance needs of the machinery based on the operating hours of the machinery, which has also become the planned expected maintenance system.

Hydraulic pump station: domestic lifting platform dedicated pump station, Italian imported pump station with external protective devices: organ m type, mesh type, and iron plate sealed type.

Single column aluminum alloy elevator with easily recognizable operation panel, multiple mechanical, electrical, and hydraulic safety protection, able to easily deliver goods to high-rise buildings. Among them, hydraulic elevators are more popular among people, and people can choose the one that suits them according to their actual situation. However, during normal work, it is important to pay attention to the lifting speed of hydraulic elevators and avoid making mistakes. So what factors will affect the lifting speed of hydraulic elevators?

For some site lifting platforms, protective railings are generally added above the platform. As lifting platforms are special equipment the National Quality Inspection Bureau strictly inspects this area. Any lifting platforms that are deemed to have safety hazards must be removed. Therefore, when asked if you want to add protective railings, do not blindly refuse. Consider whether it is necessary based on the site of use. And it is necessary to have two types of certificates, namely the 'Special Equipment Manufacturing License of the People's Republic of China' and the 'Special Equipment Installation Transformation, and Maintenance License of the People's Republic of China', in order to produce, install, and maintain. Therefore,HagueElevators on the construction site, it is necessary to ask the manufacturer whether they have these two types of certificates.

What kind of function can be achieved by installing the elevator? Before installation, confirm whether the motor and elevator are intact, and strictly check whether the dimensions of each part connected to the motor and elevator match. Here are the dimensions and fit tolerances of the positioning boss, input shaft, and elevator groove of the motor.

Administration.When conducting high-altitude operations on dangerous edges such as roofs, suspension bridges, slopes, or cliffs, guardrails or safety nets should be installed on the side facing the air or safety belts or ropes should be used.

Reset the brake; Installation and maintenance section. The maintenance section is generally installed in the fourth section. Long term promotion of downgrading manufacturers, 20 year old brand, with price advantages and guaranteed quality!

Connect the motor naturally to the elevator. When connecting, and the outer flanges of the two are parallel. Inconsistent alignment can lead to motor shaft breakage or elevator gear wear.


HagueWorkshop operation elevatorIt is better to maintain a biased operation idea



The current should exceed the rated current, and even cause the motor to stop on its own. If the shutdown time is slightly longer and the power supply is not cut off, the winding will not only overheat severely, but also burn out. When a star connected motor is mistakenly connected into a triangle, or a motor with multiple coil groups connected in series into a branch is mistakenly connected into two parallel branches,HagueSingle mast elevator, it will cause the winding and iron core to overheat, and in severe cases, currently have a wide variety in the Chinese market. They are highly favored by users due to their flexible movement, light weight, and small size.

According to different needs, different power modes can be selected, such as three-phase AC power supply, single-phase AC power supply, and internal combustion power supply. With manual hydraulic equipment, lifting operations can be carried out in places with power outages or no power supply, and components can be added. When the platform length is insufficient it can be extended to the required direction, and then the operating power can be increased. It is a must-have product of modern large-scale construction and equipment, and a necessity for high-altitude safety and civilized production.

Hague.Dirty normally closed valve; The solution is to remove the normally closed valve and use cleaning agent or cleaning.

The boarding bridge can be divided into two forms: a mobile boarding bridge and a fixed boarding bridge. A brief introduction to the application scope of a fixed boarding bridge and the use of a mobile boarding bridge: used in places without loading and unloading platforms or where mobile loading and unloading of goods are required. If there is no loading and unloading platform at the logistics site, as a remedial measure, a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope, and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

Preparation before folding and installation of the elevator. Carefully prepare a special construction plan for installation and provide safety technical disclosure to the installation personnel.