ZhejiangCar mounted scissor liftFocus on development

announcer:hp323HP155335083 release time:2024-01-29 13:50:20

Emergency bolts not tightened; The solution is to tighten the emergency valve.

During the use of hydraulic elevators, if not properly operated, there will always be problems. Many customers have reported that hydraulic elevators sometimes cannot be lifted. If the hydraulic lift pump can continue to work, other issues need to be considered. Below, the editor will explain the reasons for the hydraulic lift pump station not being oiled and solve the reasons for the hydraulic lift pump station not being oiled, as well as the solutions for mobile elevators The analysis of the pump station of hydraulic elevators such as guide rail elevators is as follows: the motor power supply is abnormal or reversed; The solution is to correctly connect the motor power supply or adjust the steering mailbox to ensure there is no hydraulic oil or insufficient oil; The solution is to add hydraulic oil.

Zhejiang.For some site lifting platforms,ZhejiangElevators for construction sites, protective railings are generally added above the platform. As lifting platforms are special equipment the National Quality Inspection Bureau strictly inspects this area. Any lifting platforms that are deemed to have safety hazards must be removed. Therefore, when asked if you want to add protective railings, do not blindly refuse. Consider whether it is necessary based on the site of use. And it is necessary to have two types of certificates, namely the 'Special Equipment Manufacturing License of the People's Republic of China' and the 'Special Equipment Installation, Transformation, and Maintenance License of the People's Republic of China', in order to produce, install, and maintain. Therefore it is necessary to ask the manufacturer whether they have these two types of certificates.

High altitude work requires the use of tool bags, and heavier and larger high-altitude work tools should be hung on stable components and cannot be placed randomly to avoid the occurrence of high-altitude falling accidents.

.The current should exceed the rated current, and even cause the motor to stop on its own. If the shutdown time is slightly longer and the power supply is not cut off, the winding will not only overheat severely, but also burn out. When a star connected motor is mistakenly connected into a triangle, or a motor with multiple coil groups connected in series into a branch is mistakenly connected into two parallel branches, it will cause the winding and iron core to overheat, and in severe cases, the winding will be burned out.

3: High pressure water abrasive rust removal. A type of spiral elevator that utilizes the impact of high-pressure water jet and abrasive to polish and remove rust, with the advantage of minimal material damage. However, making it suitable for detachable types of spiral elevators.

Install two more standard sections. Check and adjust the verticality of the guide rail frame with a theodolite to ensure that the error in two mutually perpendicular directions meets the requirements of Table 1. The above two parts are about the installation precautions for the elevator. If your work involves operating or installing the elevator, everyone must pay attention to safety.


ZhejiangCar mounted scissor liftFocus on development



The appearance of hydraulic boarding bridges to customers, there are not many manufacturers of corresponding boarding bridges. Many boarding bridge companies are leather bag companies, and they do not produce them themselves, resulting in high prices. What is important is that they do not have a good understanding of the technology of car booths, and there are often deviations when passing on the technical requirements of direct customers to the manufacturers. Therefore,Zhejiang500 kg small automatic elevator, customers who purchase boarding bridges can directly find professional manufacturers. When choosing a boarding bridge, the first thing to consider is the range of use, utilization, rated weight, and other factors of the product, and choose a boarding bridge that is suitable for the requirements of the unit. Conduct market research based on the proposed technical parameters. The first condition for selecting a supplier is to consider the manufacturer of the boarding axle, and then the after-sales service capability. As long as it is a fixed boarding bridge with good product quality, excellent performance, and complete equipment it can be chosen at a reasonable price.

How to use a hydraulic elevator and whether the emergency stop device is effective is very important during use. If special circumstances arise, the emergency stop can be used. Therefore, before use, it is necessary to carefully check whether all items are normal and ensure the effectiveness of the braking device.

Check the rollers, intermediate shafts, and bearings; Oil cylinder pin and bearing; Equality and wear of the hinge shaft and bearings of the boom; Add oil to the above components for maintenance of outdoor elevators and factory elevators. Extend the service life of bearings.

Latest quotation.The boarding bridge can be divided into two forms: a mobile boarding bridge and a fixed boarding bridge. A brief introduction to the application scope of a fixed boarding bridge and the use of a mobile boarding bridge: used in places without loading and unloading platforms or where mobile loading and unloading of goods are required. If there is no loading and unloading platform at the logistics site, as a remedial measure, a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope, and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

Outdoor elevators and factory cargo elevators are heavy lifting mechanical equipment. Outdoor elevators are used for transporting goods between floors of buildings, and are specialized hydraulic cargo elevator products. They are mainly used for transporting goods up and down between various working floors; Vertical garage and car lift between garage floors. The hydraulic system of the product is equipped with anti fall and overload protection devices,ZhejiangSingle column aluminum alloy elevator, and operation buttons can be set on each floor and lifting platform workbench to achieve multi-point operation.

Connect the motor naturally to the elevator. When connecting, it is necessary to ensure that the concentricity of the elevator output shaft and the motor input shaft is consistent, and the outer flanges of the two are parallel. Inconsistent alignment can lead to motor shaft breakage or elevator gear wear.


ZhejiangCar mounted scissor liftFocus on development



Single column aluminum alloy elevator with easily recognizable operation panel, electrical, and hydraulic safety protection, and advanced integrated hydraulic electricity

High quality brand.The hook of the seat belt should not be hung on unstable or moving objects.

Loosening: The newly processed and assembled components of high-altitude work platform equipment such as mobile elevators have a tendency to have geometric shapes and matching dimensions. In the early stages of equipment use, due to the influence of alternating loads such as impact and vibration, or factors such as heat and deformation, coupled with rapid wear and tear it is easy to cause the previously fastened components of high-altitude work platform equipment such as mobile elevators to become loose.

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).

Zhejiang.Check the rollers, intermediate shafts, and bearings; Oil cylinder pin and bearing; Equality and wear of the hinge shaft and bearings of the boom; Add oil to the above components for maintenance of outdoor elevators and factory elevators. Extend the service life of bearings.

The advantages and application fields of elevators and lifting platforms. The lifting mechanism is made of high-strength manganese steel giant tubes. Equipped with safety maintenance equipment to avoid overloading of elevators. Equipped with a safety maintenance valve to prevent hydraulic pipeline cracking. Equipped with emergency lowering equipment in case of power outage. This product is suitable for mobile high-altitude operations such as high-altitude equipment and maintenance in various industries.

The current should exceed the rated current, and even cause the motor to stop on its own. If the shutdown time is slightly longer and the power supply is not cut off, the winding will not only overheat severely, but also burn out. When a star connected motor is mistakenly connected into a triangle, or a motor with multiple coil groups connected in series into a branch is mistakenly connected into two parallel branches, it will cause the winding and iron core to overheat, and in severe cases, the winding will be burned out.