Deng laohaiFixed hydraulic boarding bridgeCauses of quality

announcer:hp161HP196399230 release time:2023-12-26 13:13:07

What are the issues to pay attention to when using the boarding bridge? For example, mobile boarding bridges are generally used outdoors, and after use, they are also placed outdoors. They are often exposed to wind, rain,Deng laohaiEmbedded boarding bridge, and sunlight, which reduces the lifespan of the boarding bridge. Therefore, the maintenance of the boarding bridge is very important. When it rains, cover the boarding bridge with a rain cloth to prevent rusting and aging.

Tighten the manual valve to close it.

Deng laohai.When working at heights exceeding 1.5 meters, safety nets or safety belts must be used.

When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge,Deng laohaiContainer boarding bridge, as well as noise when the pump station enters the air.

.Open the manual valve, slowly lower the boarding bridge, and secure more than 90% of the lip plates at the bottom of the container.

Nowadays, the electric hydraulic boarding bridge has become a loading and unloading tool used by many companies. Compared to many friends, I am still not very familiar with electric hydraulic boarding bridges. Below, the editor will explain the product parameters and specifications related to the length, slope, and height of the electric hydraulic boarding bridge.

There is a flip plate at the top of the bridge deck which is placed at the edge of the carriage to ensure a smooth transition between the passage and the carriage. Its advantages are as follows.


Deng laohaiFixed hydraulic boarding bridgeCauses of quality



There is a flip plate at the top of the bridge deck, which is placed at the edge of the carriage to ensure a smooth transition between the passage and the carriage. Its advantages are as follows.

High altitude work platform vehicles are mainly divided into four types: scissor type, straight arm type, curved arm type, and vehicular type. Scissor fork type high altitude work platform vehicles.

It is strictly prohibited to apply excessive pile loads around the foundation pit.

Range.There is a flip plate at the top of the bridge deck, which is placed at the edge of the carriage to ensure a smooth transition between the passage and the carriage. Its advantages are as follows.

Slowly reverse and park the container under the lip at the front of the boarding bridge.

These are the options for hydraulic oil for mobile boarding bridges.


Deng laohaiFixed hydraulic boarding bridgeCauses of quality



The width of the boarding bridge also requires a certain width of its own. However, if the width is too small, it is not conducive to forklift loading and unloading of goods. If the width is too large it can occupy a certain space, which is not necessary. So a reasonable width is necessary,Deng laohaiAxle Co., Ltd, usually the width of the electric hydraulic boarding bridge is 1800mm 2000mm, and 2100mm. The width of the bridge is divided into internal width and total width. As we have already mentioned, and the total width mainly refers to the width of the guardrails on both sides plus the width of the passage. The total width can be ignored in use, but everyone still cares about the internal width, which is the width of the channel.

Range.Nowadays, the electric hydraulic boarding bridge has become a loading and unloading tool used by many companies. Compared to many friends, I am still not very familiar with electric hydraulic boarding bridges. Below, slope, and height of the electric hydraulic boarding bridge.

Check the hydraulic oil quality and level. When the lifting platform is raised to a high position, the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.

Open planning before placement makes it easy to clean up clutter.

Deng laohai.When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge, as well as noise when the pump station enters the air.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

During the application process of hydraulic boarding bridges