DuisburgHydraulic boarding bridge factoryStructural analysis and research

announcer:hp161HP196399230 release time:2023-12-05 14:20:11

it must be opened

Check if the manual valve is open. When using, otherwise the boarding bridge may be damaged.

It is strictly prohibited to apply excessive pile loads around the foundation pit.

Duisburg.When the boarding axle is far away from the frame, and the air in the air spring is atmospheric, and the body and frame then reduce to the original value. The dual or multi axle air suspension boarding axle can also be lifted on a single or multiple axle when unloaded or partially loaded, which can protect the raised tires. Simultaneously reducing incorrect guidance while reducing tire wear on other axles. In addition, there are other positive effects during the driving process. On the one hand, it generates appropriate stable force when unloaded and partially loaded, and on the other hand, it improves the adhesion of the drive shaft.

The hydraulic boarding bridge not only reduces labor intensity, accelerates logistics speed, and achieves significant economic benefits. Hydraulic loading and unloading bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other transport vehicles can directly enter the truck for batch loading and unloading of goods, also known as loading and unloading platforms.

.The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, the lowering valve is not tightly sealed, and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve,DuisburgManufacturing of boarding bridges, clean the one-way valve. Check if the lowering valve has power. If there is power,DuisburgTruck boarding bridge, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

Hydraulic boarding bridges should strictly adhere to the principle of being overweight, as overloading may cause damage to objects; Working on a lifting platform without protective barriers may cause personnel to fall and cause casualties.


DuisburgHydraulic boarding bridge factoryStructural analysis and research



There are three movable boards on both sides of the air conditioning board which can effectively prevent the adjustment board from falling down and keep the pressure foot in a safe state.

Applicable scenarios: municipal road engineering inspection, street lamp maintenance, branch construction, signboard maintenance, etc.

The hydraulic system adopts imported Italian brand products, with excellent performance and minimal maintenance. The oil cylinder lifting power system, inclined plate, top, and small oil cylinder operation, can be adjusted smoothly. The height adjustment plate is a selected decorative plate and profile, with a distance of no less than 1m from the protective railing to the foundation pit. The mobile boarding bridge only requires a single person to operate, without the need for power supply, and can achieve safe and fast loading and unloading of goods. Mobile boarding bridges are widely used in cargo platforms and mobile loading and unloading sites without loading and unloading equipment. They are auxiliary equipment for cargo loading and unloading that is used in conjunction with forklifts. The sequence of earthwork excavation must comply with design conditions and follow" Trenching support, support first and then excavation, layered excavation, no overbreak&rquote; The principle of.


DuisburgHydraulic boarding bridge factoryStructural analysis and research



The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

Installation works.Do you know some of the working characteristics of hydraulic lifting boarding bridges? Today, I will take you to understand!

(3) The steel wire rope in the elevator should be regularly checked for loose strands and broken wires, as it is frequently used and is also an important component. Therefore,DuisburgMobile cllimbing, there should be no careless inspection to avoid affecting the normal use of the elevator.

Install drainage ditches on the ground near the pit of the simple boarding bridge and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.

Duisburg.The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from 7000mm to 7500mm, mainly considering safety and stability of use. For a long time, the manufacturer of the boarding axle has no turnover to avoid the price difference, which is 20% higher than the market value! More than one ton is more expensive!

Tighten the manual valve to close it.

Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.