Ethel mountainAxle Co., LtdCan accuracy deviation be allowed

announcer:hp161HP196399230 release time:2023-10-20 17:45:21

as the name suggests, refers to the boarding bridge embedded in the loading and unloading operation platform. The installed boarding bridge main board surface is horizontal with the upper plane of the loading and unloading operation platform. Completely integrated into the platform, it will not affect other operational tasks on the platform without loading and unloading operations. The boarding bridge with this type of structure is widely used and is also a relatively fast boarding auxiliary device. Its design is usually fully standardized as early as the structural design of buildings. We are a long-term manufacturer of boarding bridges. Welcome to inquire

The pressure on the axle will reduce the service life of the boarding axle.

Ethel mountain.Regularly draining and refilling the oil tank to remove water and sediment is crucial for removing impurities in the oil, but regularly emptying the entire hydraulic system is also crucial. This is a reliable way to completely remove system impurities, oxidized hydraulic oil, the recommended clean hydraulic oil should be added back to the system. If the oil is completely contaminated, especially when the pump is damaged, the oil in the tank must be cleaned. The oil cleaning device allows the oil to flow until the oil pollution indicator shows that the oil is in a satisfactory state.

As an important part of the boarding bridge, the height can be adjusted according to the different vehicles of the goods, so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm, which can be met by almost all freight vehicles (with a general vehicle height of 1600).

.When working on the hydraulic boarding bridge, the support legs must be extended, and the support leg bolts must be adjusted to ensure that the lifting platform is stably stressed on the support legs and kept horizontal; During the lifting process and in the lifting state, the lifting platform must not be moved, and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use, check whether the electrical equipment is normal; All shaft pin oil holes must be oiled before each use. Before use, it is necessary to perform no-load lifting and check whether the hydraulic system is normal; The load of the workbench should not exceed the rated value and it should not be subjected to intense manual shaking; The hydraulic oil in the oil tank must be replaced every 500 hours of operation.

For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected so it is not a major problem.


Ethel mountainAxle Co., LtdCan accuracy deviation be allowed



The hydraulic lifting boarding bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other handling vehicles can directly enter the truck for batch loading and unloading of goods, and single person operations can achieve fast loading and unloading of goods. Reduce a large amount of labor, improve work efficiency, and achieve greater economic benefits for enterprises.

Solid rubber tires have no inflatable inner tubes and can move and work on various complex surfaces without worrying about puncturing the inner tubes making them less prone to damage. They have stronger adaptability to the environment. Solid rubber tires have higher load-bearing capacity than ordinary pneumatic rubber tires of the same model, are more wear-resistant, have a longer service life, and are more cost-effective. This is why mobile boarding bridges are now equipped with solid rubber tires.

The precautions during the use of hydraulic boarding bridges are hoped to be helpful to you.

Word of mouth recommendation.Open planning before placement makes it easy to clean up clutter.

The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from 7000mm to 7500mm, mainly considering safety and stability of use. For a long time, the manufacturer of the boarding axle has no turnover to avoid the price difference, which is 20% higher than the market value! More than one ton is more expensive!

Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage,Ethel mountainMobile lifting boarding bridge, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, overflow valve pressure is low lowering valve is open, oil level is too low, oil pump is empty, oil suction filter is blocked, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.


Ethel mountainAxle Co., LtdCan accuracy deviation be allowed



The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from 7000mm to 7500mm,Ethel mountainBoarding axle brand, mainly considering safety and stability of use. For a long time, the manufacturer of the boarding axle has no turnover to avoid the price difference, which is 20% higher than the market value! More than one ton is more expensive!

Application process.As we all know

Usage scenario: Widely applicable for installation, maintenance, and high-altitude work platform vehicles in industries such as municipal administration, electricity, streetlights,Ethel mountainAutomobile boarding bridge manufacturer, advertising, communication, photography, landscaping, transportation, docks, airports and ports, and large industrial and mining enterprises.

The hydraulic boarding bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods, and is our good helper. However, malfunctions during use are inevitable. What should we do when encountering a malfunction?

Ethel mountain.It is strictly prohibited to apply excessive pile loads around the foundation pit.

When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge, as well as noise when the pump station enters the air.