toray Fixed hydraulic boarding axleKnowledge summary

announcer:hp161HP196399230 release time:2024-09-09 11:14:31

mainly considering safety and stability of use. For a long time, the manufacturer of the boarding axle has no turnover to avoid the price difference, which is 20% higher than the market value! More than one ton is more expensive!

Embedded boarding bridge, as the name suggests, it will not affect other operational tasks on the platform without loading and unloading operations. The boarding bridge with this type of structure is widely used and is also a relatively fast boarding auxiliary device. Its design is usually fully standardized as early as the structural design of buildings. We are a long-term manufacturer of boarding bridges. Welcome to inquire

toray .When the boarding axle is far away from the frame, the rod moves downward to open the air release valve, and the air in the air spring is atmospheric, and the body and frame then reduce to the original value. The dual or multi axle air suspension boarding axle can also be lifted on a single or multiple axle when unloaded or partially loaded, which can protect the raised tires. Simultaneously reducing incorrect guidance while reducing tire wear on other axles. In addition, there are other positive effects during the driving process. On the one hand, it generates appropriate stable force when unloaded and partially loaded, and on the other hand, it improves the adhesion of the drive shaft.

  1. Before use, check the boarding bridge for obvious damage such as cracks and broken wires.

.Embedded boarding bridge, as the name suggests, refers to the boarding bridge embedded in the loading and unloading operation platform. The installed boarding bridge main board surface is horizontal with the upper plane of the loading and unloading operation platform. Completely integrated into the platform, it will not affect other operational tasks on the platform without loading and unloading operations. The boarding bridge with this type of structure is widely used and is also a relatively fast boarding auxiliary device. Its design is usually fully standardized as early as the structural design of buildings. We are a long-term manufacturer of boarding bridges. Welcome to inquire

Reason for the lifting table not lowering: The lowering valve is malfunctioning, and the lowering speed valve is out of adjustment. Solution: When pressing the lowering button, check if the lowering valve is energized. If there is no electricity, troubleshoot the lowering valve itself or replace the lowering valve. The lowering valve should be kept clean.

When working on the hydraulic boarding bridge, the support legs must be extended,toray The boarding bridge, and the support leg bolts must be adjusted to ensure that the lifting platform is stably stressed on the support legs and kept horizontal; During the lifting process and in the lifting state, the lifting platform must not be moved, and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use, check whether the electrical equipment is normal; All shaft pin oil holes must be oiled before each use. Before use it is necessary to perform no-load lifting and check whether the hydraulic system is normal; The load of the workbench should not exceed the rated value, and it should not be subjected to intense manual shaking; The hydraulic oil in the oil tank must be replaced every 500 hours of operation.


toray Fixed hydraulic boarding axleKnowledge summary



For slopes that are unstable or unstable after earthwork excavation top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

Keep the hydraulic boarding bridge system clean: regularly replace the oil and filter. Good hydraulic oil contains various additives that can prevent oil deterioration or blockage of system components. However, these additives will lose their effectiveness after a period of time. Therefore, the oil should be replaced regularly to ensure that the additives are effective. The filter can only absorb a limited number of dirt particles and other impurities from the oil. Replace the filter according to the recommended cycle to keep the system clean.

Open the manual valve, slowly lower the boarding bridge, and secure more than 90% of the lip plates at the bottom of the container.

query.conduct.

Shake the handle to raise the boarding bridge to the height of the container.

The hydraulic boarding bridge not only reduces labor intensity, accelerates logistics speed, and achieves significant economic benefits. Hydraulic loading and unloading bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other transport vehicles can directly enter the truck for batch loading and unloading of goods,toray Manufacturing of boarding bridges, also known as loading and unloading platforms.


toray Fixed hydraulic boarding axleKnowledge summary



Shake the handle to raise the boarding bridge to the height of the container.

Project scope.When the hydraulic oil is insufficient, the hydraulic pump will produce suction phenomenon, causing air to enter the hydraulic oil and also producing high noise. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

The natural frequency of the air spring is stable, so its performance is also stable which means that the air spring is closer to the ideal state. How does the air spring change the air pressure in the airbag with different loads to achieve the goal of keeping the distance between the car body and the road surface unchanged. The height valve 3 shown serves this purpose. The height valve is fixed on the frame and the connecting rod is connected to the hydraulic boarding bridge. The height valve has two valves, namely,toray Telescopic boarding bridge, the charging valve for air supply and the air release valve for air supply. These two valves are both connected by the rod. When the car load increases, the boarding bridge moves close to the frame, the connecting rod rises. When the connecting rod mechanism opens the charging valve, compressed air enters the air spring, and the frame and body rise until the height of the body is restored.

The pressure on the axle will reduce the service life of the boarding axle.

toray .During use, close attention should be paid to the condition of the equipment, and if there are any problems, the use should be stopped immediately.

Portable hydraulic press boarding bridge: It is a widely used type suitable for places where loading, unloading, and transportation are not fixed or moving; Mobile hydraulic press boarding bridge: suitable for fixed and immovable goods such as ports, cargo platforms, warehouses, etc

During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.