LamarContainer loading and unloading bridgeBefore operation, these general machinery manufacturing knowledge still need to be known

announcer:hp161HP196399230 release time:2024-09-07 11:46:35

The safety valve of the mobile hydraulic boarding bridge can also generate high noise. When air is mixed into hydraulic oil, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, we should regularly clean the safety valve, and replace it if it is damaged or severely worn.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

Lamar.The mobile boarding bridge suddenly loses control of the operating platform.

When confirming that the lip is fixed to the container, pull out the hook to hook it into the container, tighten the chain to ensure that it does not loosen, and press the brake blocks on both sides. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

.When working on the hydraulic boarding bridge, the support legs must be extended, the lifting platform must not be moved, and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use, check whether the electrical equipment is normal; All shaft pin oil holes must be oiled before each use. Before use it is necessary to perform no-load lifting and check whether the hydraulic system is normal; The load of the workbench should not exceed the rated value, the support legs must be extended, and the support leg bolts must be adjusted to ensure that the lifting platform is stably stressed on the support legs and kept horizontal; During the lifting process and in the lifting state, the lifting platform must not be moved, and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use, check whether the electrical equipment is normal; All shaft pin oil holes must be oiled before each use. Before use, it is necessary to perform no-load lifting and check whether the hydraulic system is normal; The load of the workbench should not exceed the rated value,LamarMounted axle hydraulic fixed type, and it should not be subjected to intense manual shaking; The hydraulic oil in the oil tank must be replaced every 500 hours of operation.

There are three movable boards on both sides of the air conditioning board, which can effectively prevent the adjustment board from falling down and keep the pressure foot in a safe state.


LamarContainer loading and unloading bridgeBefore operation, these general machinery manufacturing knowledge still need to be known



Install a 5m high protective railing around the foundation pit of the simple boarding bridge, with a distance of no less than 1m from the protective railing to the foundation pit. The mobile boarding bridge only requires a single person to operate, without the need for power supply, and can achieve safe and fast loading and unloading of goods. Mobile boarding bridges are widely used in cargo platforms and mobile loading and unloading sites without loading and unloading equipment. They are auxiliary equipment for cargo loading and unloading that is used in conjunction with forklifts. The sequence of earthwork excavation must comply with design conditions and follow" Trenching support, support first and then excavation, layered excavation, no overbreak&rquote; The principle of.

B) When maintaining the hydraulic system, only clean plastic plugs can be used to seal the ends of the pipeline.

Slowly reverse and park the container under the lip at the front of the boarding bridge.

reform.The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction filter is blocked, oil suction section is leaking and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.

Check if the manual valve is open. When using it must be opened, otherwise the boarding bridge may be damaged.


LamarContainer loading and unloading bridgeBefore operation, these general machinery manufacturing knowledge still need to be known



There is a lot of noise generated when using a mobile hydraulic boarding bridge. So, where are these noises caused? In fact, pump stations, steel cylinders, and steel equipment are all sources of noise. Today we will analyze for you: 1. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations. After hearing the noise from the hydraulic boarding bridge,LamarFixed hydraulic boarding bridge, first check if there are any problems with the hydraulic pump station, motor, and fixing device, and if the noise is caused by its vibration.

Inspection standard.Embedded boarding bridge, as the name suggests, refers to the boarding bridge embedded in the loading and unloading operation platform. The installed boarding bridge main board surface is horizontal with the upper plane of the loading and unloading operation platform. Completely integrated into the platform,LamarBoarding axle moving hydraulic pressure, it will not affect other operational tasks on the platform without loading and unloading operations. The boarding bridge with this type of structure is widely used and is also a relatively fast boarding auxiliary device. Its design is usually fully standardized as early as the structural design of buildings. We are a long-term manufacturer of boarding bridges. Welcome to inquire

Staying below high-altitude work sites is prohibited, and safety nets or other protective devices should be installed below the work site to avoid injury from falling objects.

The hydraulic system adopts imported Italian brand products, with excellent performance and minimal maintenance. The oil cylinder lifting power system, inclined plate, top, and small oil cylinder operation, can be adjusted smoothly. The height adjustment plate is a selected decorative plate and profile, with a long service life. Various qualified manufacturers of boarding bridges are welcome to inquire by phone and sincerely invite cooperation!

Lamar.The precautions during the use of hydraulic boarding bridges are hoped to be helpful to you.

Open planning before placement makes it easy to clean up clutter.

Install a 5m high protective railing around the foundation pit of the simple boarding bridge, without the need for power supply, and can achieve safe and fast loading and unloading of goods. Mobile boarding bridges are widely used in cargo platforms and mobile loading and unloading sites without loading and unloading equipment. They are auxiliary equipment for cargo loading and unloading that is used in conjunction with forklifts. The sequence of earthwork excavation must comply with design conditions and follow" Trenching support, support first and then excavation, layered excavation, no overbreak&rquote; The principle of.