After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working, the workbench should be lowered to a low position.

Nowadays, the electric hydraulic boarding bridge has become a loading and unloading tool used by many companies. Compared to many friends, I am still not very familiar with electric hydraulic boarding bridges. Below, the editor will explain the product parameters and specifications related to the length, slope, and height of the electric hydraulic boarding bridge.

Finlo.Function: Convenient unloading, strong stability, and low maintenance cost. Suitable for various vehicles on loading and unloading sites and places with relatively busy traffic. Loading and unloading platform vehicles lifting platform vehicles, and unloading platform vehicles: Anti slip device: This device is welded from steel plates, which can effectively achieve anti slip function and is reliable.

The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

.During use, close attention should be paid to the condition of the equipment, and if there are any problems the use should be stopped immediately.

During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.

Is the boarding bridge easy to use? Those who have used the boarding bridge know that it is a very useful mechanical equipment, which brings great convenience to the logistics industry and some industrial factories that need to load and unload goods. Some enterprises also value the development prospects of the boarding bridge and set up factory boarding bridges. High priced and various specifications of boarding bridge manufacturers provide timely supply, with high cost-effectiveness, and has become the preferred brand for many wire products. Welcome to choose!


FinloProvincial Mobile Boarding BridgeIntroduction to inspection standards before leaving the factory



Nowadays, the electric hydraulic boarding bridge has become a loading and unloading tool used by many companies. Compared to many friends, I am still not very familiar with electric hydraulic boarding bridges. Below, the editor will explain the product parameters and specifications related to the length, slope, and height of the electric hydraulic boarding bridge.

When the boarding axle is far away from the frame, the rod moves downward to open the air release valve, and the air in the air spring is atmospheric, and the body and frame then reduce to the original value. The dual or multi axle air suspension boarding axle can also be lifted on a single or multiple axle when unloaded or partially loaded, which can protect the raised tires. Simultaneously reducing incorrect guidance while reducing tire wear on other axles. In addition, there are other positive effects during the driving process. On the one hand, it generates appropriate stable force when unloaded and partially loaded, and on the other hand, as well as noise when the pump station enters the air.

Quality recommendation.During excavation, the operation should be stopped in a timely manner and reported to the person in charge of the hydraulic boarding bridge for handling. The fixed boarding bridge is an auxiliary equipment for loading and unloading in conjunction with the storage platform. This equipment is integrated with the platform and can be adjusted up or down according to the different heights of the truck carriage, making it convenient for forklifts to enter the carriage. The equipment adopts an imported hydraulic pump station with anti rolling skirts on both sides,FinloFinished boarding bridge, making work safer and improving work efficiency.

Install a 5m high protective railing around the foundation pit of the simple boarding bridge, with a distance of no less than 1m from the protective railing to the foundation pit. The mobile boarding bridge only requires a single person to operate, without the need for power supply, and can achieve safe and fast loading and unloading of goods. Mobile boarding bridges are widely used in cargo platforms and mobile loading and unloading sites without loading and unloading equipment. They are auxiliary equipment for cargo loading and unloading that is used in conjunction with forklifts. The sequence of earthwork excavation must comply with design conditions and follow" Trenching support, support first and then excavation, layered excavation,FinloBuy hydraulic boarding bridge, no overbreak&rquote; The principle of.

When working on the hydraulic boarding bridge, the support legs must be extended and the support leg bolts must be adjusted to ensure that the lifting platform is stably stressed on the support legs and kept horizontal; During the lifting process and in the lifting state, and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge the lifting platform must not be moved, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use, check whether the electrical equipment is normal; All shaft pin oil holes must be oiled before each use. Before use, it is necessary to perform no-load lifting and check whether the hydraulic system is normal; The load of the workbench should not exceed the rated value, and it should not be subjected to intense manual shaking; The hydraulic oil in the oil tank must be replaced every 500 hours of operation.


FinloProvincial Mobile Boarding BridgeIntroduction to inspection standards before leaving the factory



For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

market.The pressure on the axle will reduce the service life of the boarding axle.

Introduction to Fixed Boarding Bridge Loading and unloading Mobile Boarding Bridge is a very common structural form in modern logistics sites. It is the point and endpoint of the enterprise's logistics chain, and is a loading and unloading platform vehicle for enterprises to quickly and turnover products and goods. The height of the loading and unloading operation platform truck is fixed, but the height of the transport carriages does not always form a certain height difference or gap between the transport vehicle and the loading and unloading platform. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to quickly enter and exit transportation vehicles for loading and unloading operations.

The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time, according to the characteristics of the work, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems, strengthen dynamic management of equipment faults, monitor the status of key parts, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, establish a spare parts warehouse for vulnerable and commonly used parts, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers, strengthen the professional quality and professionalism of lifting platform maintenance personnel, so that they can handle faults in a short period of time.

Finlo.It is strictly prohibited to apply excessive pile loads around the foundation pit.

To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use,FinloHydraulic boarding bridge, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, so it is not a major problem.

There is a flip plate at the top of the bridge deck, which is placed at the edge of the carriage to ensure a smooth transition between the passage and the carriage. Its advantages are as follows.