RaleighMobile hydraulic loading and unloading boarding bridgeWhich one is better

announcer:hp161HP196399230 release time:2024-07-01 16:40:25

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

As an important part of the boarding bridge, the height can be adjusted according to the different vehicles of the goods, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm, which can be met by almost all freight vehicles (with a general vehicle height of 1600).

Raleigh.B) When maintaining the hydraulic system, if unidentifiable items or unforeseeable situations are found, the operation should be stopped in a timely manner and reported to the person in charge of the hydraulic boarding bridge for handling. The fixed boarding bridge is an auxiliary equipment for loading and unloading in conjunction with the storage platform. This equipment is integrated with the platform and can be adjusted up or down according to the different heights of the truck carriage, making it convenient for forklifts to enter the carriage. The equipment adopts an imported hydraulic pump station with anti rolling skirts on both sides, making work safer and improving work efficiency.

.Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.

The hydraulic boarding bridge not only reduces labor intensity, but also doubles the efficiency of loading and unloading operations, accelerates logistics speed and achieves significant economic benefits. Hydraulic loading and unloading bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other transport vehicles can directly enter the truck for batch loading and unloading of goods, also known as loading and unloading platforms.

Do you know some of the working characteristics of hydraulic lifting boarding bridges? Today, the relief valve gets stuck or severely worn, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, we should regularly clean the safety valve, and replace it if it is damaged or severely worn.

The above content mainly shares the importance analysis of regular maintenance of mobile boarding bridges with everyone, hoping that everyone can take it seriously and not overlook it.

During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.

where.When it comes to fixed hydraulic boarding bridges, I believe

As an important part of the boarding bridge, the height can be adjusted according to the different vehicles of the goods, so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm, which can be met by almost all freight vehicles (with a general vehicle height of 1600).

Shake the handle to raise the boarding bridge to the height of the container.


RaleighMobile hydraulic loading and unloading boarding bridgeWhich one is better



Slowly reverse and park the container under the lip at the front of the boarding bridge.

Industry management.When working in foundation pits or depths, a helmet must be worn.

Features: Shear mechanical structure,RaleighHydraulic boarding bridge, working height generally ranging from 6 meters to 14 meters, high stability after lifting the platform, wide working platform vehicle and high load capacity, wide range of high-altitude work, suitable for multiple people working simultaneously. The power form can be selected according to different requirements (such as three-phase AC power supply,RaleighTelescopic boarding bridge, DC power supply, and internal combustion power supply). The manual hydraulic device can lift and retract normally in places with power outage or no power supply, increase the telescopic platform car, and extend to necessary positions in case of insufficient length of the platform car, improving work efficiency.

The precautions during the use of hydraulic boarding bridges are hoped to be helpful to you.

Raleigh.Common&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque, and be more robust than other channel structures.

What should I pay attention to when choosing a boarding bridge? The selection and purchase of the boarding bridge involves paying attention to three issues, including its range of use, rated load,RaleighHydraulic fixed boarding bridge, and other factors; Their understanding of the manufacturer of the boarding bridge, whether their enterprise qualifications special equipment licenses are complete, how many after-sales service outlets are there in the country, how about their after-sales service attitude, and whether they are timely; The important point is whether the quality is good or not, and whether the price is reasonable. If both of these situations are reasonable, you can choose the products of the manufacturer.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform and there is basically no change to the building structure.