During the application process of hydraulic boarding bridges,EmenContainer dedicated boarding bridge, it is necessary to follow the operating procedures to ensure the normal operation of the equipment. What precautions should we take when using hydraulic boarding bridges?

Common&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque, and be more robust than other channel structures.

Emen.The emergence of mobile boarding bridges solves the problem of cargo loading and unloading auxiliary boarding equipment for forklifts entering the ground of freight containers and the height difference between trucks. The mobile boarding bridge can adjust the height of the mobile boarding bridge to be level with the height of the container according to the height of the truck container, achieving rapid loading and unloading of goods and improving the efficiency of cargo loading and unloading. So,EmenDengCheQiao Manufacturing Factory, what are the abnormalities that can be observed during the use of the mobile boarding bridge?

Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction filter is blocked, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.

.Operation degree: There are two types of operations that can be used to raise and lower the boarding bridge. One is a manual pump station, which uses manual hydraulic lifting, which is labor-intensive and somewhat labor-intensive. Advantages: It can be operated and used in any situation. Two types of electric pump stations use electric hydraulic lifting and lowering, which reduces labor intensity and saves labor. Disadvantage: Once the power is cut off, it will not be able to be used, but now there are both manual and electric boarding bridges that are more convenient to use.

These are the options for hydraulic oil for mobile boarding bridges.

The width of the boarding bridge also requires a certain width of its own. However, if the width is too small, it is not conducive to forklift loading and unloading of goods. If the width is too large, it can occupy a certain space which is not necessary. So a reasonable width is necessary, usually the width of the electric hydraulic boarding bridge is 1800mm, 2000mm, and 2100mm. The width of the bridge is divided into internal width and total width. As we have already mentioned, the internal width is the width of the passage, and the total width mainly refers to the width of the guardrails on both sides plus the width of the passage. The total width can be ignored in use, but everyone still cares about the internal width, which is the width of the channel.


EmenContainer boarding bridgeEntity



There is a flip plate at the top of the bridge deck, which is placed at the edge of the carriage to ensure a smooth transition between the passage and the carriage. Its advantages are as follows.

There are the following: (1) The brake of the elevator should be regularly inspected to see if its clearance is appropriate, in order to ensure its flexibility and reliability in use. In addition, it is necessary to check for any dirt, and if any it should be cleaned in a timely manner. (2) For the part of the moving boarding bridge,EmenMobile boarding bridge, it should be carried out in accordance with the specified requirements, and it should be comprehensive and sufficient without any omissions. However, the amount of oil should not be too much, as too much can also cause problems.

After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working, the workbench should be lowered to a low position.

High value.Reason for the lifting table not lowering: The lowering valve is malfunctioning, and the lowering speed valve is out of adjustment. Solution: When pressing the lowering button, check if the lowering valve is energized. If there is no electricity, try to eliminate it; If there is electricity troubleshoot the lowering valve itself or replace the lowering valve. The lowering valve should be kept clean.

There is a flip plate at the top of the bridge deck, which is placed at the edge of the carriage to ensure a smooth transition between the passage and the carriage. Its advantages are as follows.

After the boarding bridge work is completed, the workbench should be lowered to a low position.


EmenContainer boarding bridgeEntity



To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, so it is not a major problem.

Job description.The safety valve of the mobile hydraulic boarding bridge can also generate high noise. When air is mixed into hydraulic oil, the relief valve gets stuck or severely worn, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, we should regularly clean the safety valve, and replace it if it is damaged or severely worn.

The mobile boarding bridge suddenly loses control of the operating platform.

Shake the handle to raise the boarding bridge to the height of the container.

Emen.The pressure on the axle will reduce the service life of the boarding axle.

Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.