There is a flip plate at the top of the bridge deck, platforms, warehouses, etc. according to user needs. Special designs can be made in terms of external dimensions, load etc. The fixed boarding bridge is installed on the side of the cargo platform, flush with the ground and side of the cargo platform. The bridge deck of a fixed boarding bridge can tilt up and down, and its outer end can be higher or lower than the plane of the cargo platform, making it equal to the height of the carriage. There is a flip board at the top of the bridge, which automatically attaches to the edge of the carriage, ensuring a smooth passage between the cargo platform and the carriage.

Embedded boarding bridge, as the name suggests, refers to the boarding bridge embedded in the loading and unloading operation platform. The installed boarding bridge main board surface is horizontal with the upper plane of the loading and unloading operation platform. Completely integrated into the platform,El SalvadorBoarding axle hydraulic mobile type, it will not affect other operational tasks on the platform without loading and unloading operations. The boarding bridge with this type of structure is widely used and is also a relatively fast boarding auxiliary device. Its design is usually fully standardized as early as the structural design of buildings. We are a long-term manufacturer of boarding bridges. Welcome to inquire

.What are the issues to pay attention to when using the boarding bridge? For example, mobile boarding bridges are generally used outdoors, and after use, they are also placed outdoors. They are often exposed to wind, rain, and sunlight, which reduces the lifespan of the boarding bridge. Therefore,El SalvadorMobile hydraulic boarding bridge, the maintenance of the boarding bridge is very important. When it rains, cover the boarding bridge with a rain cloth to prevent rusting and aging.

The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking the lowering valve is not tightly sealed, and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.

What is a hydraulic boarding axle? The hydraulic boarding bridge is a special auxiliary equipment used for fast loading and unloading of goods, and its height adjustment function can build a bridge between the truck and the warehouse platform. What are the operational steps we take during use?


El SalvadorContainer fixed boarding bridgeWhat are the steps to install and use



The correct operation of the hydraulic boarding bridge is good maintenance, and how to operate it correctly. Let me briefly introduce the operating steps of the hydraulic boarding bridge,El SalvadorFolding boarding bridge, hoping to bring more help to everyone.

(5) Each mechanism in the elevator should be checked for normal operation and any noise or other malfunctions. If any, they should be promptly addressed and resolved. All wires and cables in the mobile boarding bridge should be checked for any damage or damage, and if any, they should be promptly wrapped or replaced with new ones.

There is a lot of noise generated when using a mobile hydraulic boarding bridge. So, where are these noises caused? In fact, pump stations, and steel equipment are all sources of noise. Today we will analyze for you: 1. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations. After hearing the noise from the hydraulic boarding bridge, first check if there are any problems with the hydraulic pump station, valve, and fixing device, and if the noise is caused by its vibration.

Test method.The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, the lowering valve is not tightly sealed and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.

The safety valve of the mobile hydraulic boarding bridge can also generate high noise. When air is mixed into hydraulic oil, the relief valve gets stuck or severely worn, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, we should regularly clean the safety valve, and replace it if it is damaged or severely worn.

Hydraulic boarding bridges should strictly adhere to the principle of being overweight, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

Test results.Common&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque, and be more robust than other channel structures.

Keep the work area clean: A) When refueling or refilling the fuel tank, ensure that the area around the filter box cover is clean. Only clean oil and funnels or containers can be used. Do not bring dirt into the system– It can only be clean oil.

As an important part of the boarding bridge, the height can be adjusted according to the different vehicles of the goods, so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm, which can be met by almost all freight vehicles (with a general vehicle height of 1600).

El Salvador.Install a 5m high protective railing around the foundation pit of the simple boarding bridge, with a distance of no less than 1m from the protective railing to the foundation pit. The mobile boarding bridge only requires a single person to operate, without the need for power supply, and can achieve safe and fast loading and unloading of goods. Mobile boarding bridges are widely used in cargo platforms and mobile loading and unloading sites without loading and unloading equipment. They are auxiliary equipment for cargo loading and unloading that is used in conjunction with forklifts. The sequence of earthwork excavation must comply with design conditions and follow" Trenching support, support first and then excavation, layered excavation, no overbreak&rquote; The principle of.

During excavation, if unidentifiable items or unforeseeable situations are found, the operation should be stopped in a timely manner and reported to the person in charge of the hydraulic boarding bridge for handling. The fixed boarding bridge is an auxiliary equipment for loading and unloading in conjunction with the storage platform. This equipment is integrated with the platform and can be adjusted up or down according to the different heights of the truck carriage, making it convenient for forklifts to enter the carriage. The equipment adopts an imported hydraulic pump station with anti rolling skirts on both sides, making work safer and improving work efficiency.

The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, the lowering valve is not tightly sealed, and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.