The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from 7000mm to 7500mm, mainly considering safety and stability of use. For a long time, the manufacturer of the boarding axle has no turnover to avoid the price difference, which is 20% higher than the market value! More than one ton is more expensive!

The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

Luancheng.Keep the work area clean: A) When refueling or refilling the fuel tank, ensure that the area around the filter box cover is clean. Only clean oil and funnels or containers can be used. Do not bring dirt into the system– It can only be clean oil.

The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, the lowering valve is not tightly sealed, and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.

.conduct.

Reason for the lifting table not lowering: The lowering valve is malfunctioning, and the lowering speed valve is out of adjustment. Solution: When pressing the lowering button, check if the lowering valve is energized. If there is no electricity, try to eliminate it; If there is electricity, it should be checked in advance before use, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on press the up button, so it is not a major problem.


LuanchengPlatform boarding bridgeWhat are the industry devices



After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working, the workbench should be lowered to a low position.

Remove and disassemble the lowering valve, blow the valve core clean with compressed air, and then reinstall it.

The safety valve of the mobile hydraulic boarding bridge can also generate high noise. When air is mixed into hydraulic oil, the relief valve gets stuck or severely worn, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore we should regularly clean the safety valve, and replace it if it is damaged or severely worn.

middleman.Embedded boarding bridge, as the name suggests,LuanchengLifting and lowering of boarding bridge, refers to the boarding bridge embedded in the loading and unloading operation platform. The installed boarding bridge main board surface is horizontal with the upper plane of the loading and unloading operation platform. Completely integrated into the platform, it will not affect other operational tasks on the platform without loading and unloading operations. The boarding bridge with this type of structure is widely used and is also a relatively fast boarding auxiliary device. Its design is usually fully standardized as early as the structural design of buildings. We are a long-term manufacturer of boarding bridges. Welcome to inquire

The safety valve of the mobile hydraulic boarding bridge can also generate high noise. When air is mixed into hydraulic oil the relief valve gets stuck or severely worn, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, and replace it if it is damaged or severely worn.

For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.


LuanchengPlatform boarding bridgeWhat are the industry devices



Open planning before placement makes it easy to clean up clutter.

Production department.The pressure on the axle will reduce the service life of the boarding axle.

Staying below high-altitude work sites is prohibited, and safety nets or other protective devices should be installed below the work site to avoid injury from falling objects.

The safety valve of the mobile hydraulic boarding bridge can also generate high noise. When air is mixed into hydraulic oil, the relief valve gets stuck or severely worn, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short,LuanchengMobile hydraulic loading and unloading boarding bridge, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, we should regularly clean the safety valve, and replace it if it is damaged or severely worn.

Luancheng.The pressure on the axle will reduce the service life of the boarding axle.

Install a 5m high protective railing around the foundation pit of the simple boarding bridge, with a distance of no less than 1m from the protective railing to the foundation pit. The mobile boarding bridge only requires a single person to operate, without the need for power supply, and can achieve safe and fast loading and unloading of goods. Mobile boarding bridges are widely used in cargo platforms and mobile loading and unloading sites without loading and unloading equipment. They are auxiliary equipment for cargo loading and unloading that is used in conjunction with forklifts. The sequence of earthwork excavation must comply with design conditions and follow" Trenching support, support first and then excavation, layered excavation, no overbreak&rquote; The principle of.

During excavation,LuanchengDengCheQiao Manufacturing Factory, if unidentifiable items or unforeseeable situations are found, the operation should be stopped in a timely manner and reported to the person in charge of the hydraulic boarding bridge for handling. The fixed boarding bridge is an auxiliary equipment for loading and unloading in conjunction with the storage platform. This equipment is integrated with the platform and can be adjusted up or down according to the different heights of the truck carriage, making it convenient for forklifts to enter the carriage. The equipment adopts an imported hydraulic pump station with anti rolling skirts on both sides, making work safer and improving work efficiency.