DortmundFixed boarding bridgeHow is the functionality?

announcer:hp161HP196399230 release time:2024-06-02 09:57:20

and there is basically no change to the building structure.

The hydraulic system adopts imported Italian brand products

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform,DortmundMounted axle hydraulic fixed type, with excellent performance and minimal maintenance. The oil cylinder lifting power system,DortmundFixed hydraulic boarding bridge, inclined plate, top,DortmundBoarding bridge platform, and small oil cylinder operation, can be adjusted smoothly. The height adjustment plate is a selected decorative plate and profile, with a long service life. Various qualified manufacturers of boarding bridges are welcome to inquire by phone and sincerely invite cooperation!

Dortmund.The product has a sturdy structure, a large load-bearing capacity, smooth lifting simple and convenient installation and maintenance, making it an ideal and economical cargo conveying equipment for replacing elevators between low floors. The editor will share with you some common knowledge about daily maintenance of outdoor elevators: When personnel enter the interior of the lifting platform for maintenance, they must hang the elevator to prevent sudden lowering of the platform and causing casualties.

When it comes to fixed hydraulic boarding bridges, I believe

.The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, the lowering valve is not tightly sealed, and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve clean the one-way valve. Check if the lowering valve has power. If there is power, collision of the support structure should be prevented troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.

During the excavation process of the foundation pit of the simple boarding bridge, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, which can effectively prevent the adjustment board from falling down and keep the pressure foot in a safe state.

The above content mainly shares the importance analysis of regular maintenance of mobile boarding bridges with everyone, hoping that everyone can take it seriously and not overlook it.

When working in foundation pits or depths, a helmet must be worn.

Work courses.When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge, as well as noise when the pump station enters the air.

Is the boarding bridge easy to use? Those who have used the boarding bridge know that it is a very useful mechanical equipment, which brings great convenience to the logistics industry and some industrial factories that need to load and unload goods. Some enterprises also value the development prospects of the boarding bridge and set up factory boarding bridges. High priced and various specifications of boarding bridge manufacturers provide timely supply, with high cost-effectiveness, and has become the preferred brand for many wire products. Welcome to choose!

The pressure on the axle will reduce the service life of the boarding axle.


DortmundFixed boarding bridgeHow is the functionality?



When replacing hydraulic oil, as well as noise when the pump station enters the air.

Project scope.Install a 5m high protective railing around the foundation pit of the simple boarding bridge, with a distance of no less than 1m from the protective railing to the foundation pit. The mobile boarding bridge only requires a single person to operate, without the need for power supply, and can achieve safe and fast loading and unloading of goods. Mobile boarding bridges are widely used in cargo platforms and mobile loading and unloading sites without loading and unloading equipment. They are auxiliary equipment for cargo loading and unloading that is used in conjunction with forklifts. The sequence of earthwork excavation must comply with design conditions and follow" Trenching support, support first and then excavation, layered excavation, no overbreak&rquote; The principle of.

Features: Shear mechanical structure, working height generally ranging from 6 meters to 14 meters, high stability after lifting the platform, wide working platform vehicle and high load capacity, wide range of high-altitude work, suitable for multiple people working simultaneously. The power form can be selected according to different requirements (such as three-phase AC power supply, single-phase AC power supply, DC power supply, and extend to necessary positions in case of insufficient length of the platform car, improving work efficiency.

Reason for the lifting table not lowering: The lowering valve is malfunctioning, and the lowering speed valve is out of adjustment. Solution: When pressing the lowering button, check if the lowering valve is energized. If there is no electricity, try to eliminate it; If there is electricity, troubleshoot the lowering valve itself or replace the lowering valve. The lowering valve should be kept clean.

Dortmund.Hydraulic boarding bridges should strictly adhere to the principle of being overweight, as overloading may cause damage to objects; Working on a lifting platform without protective barriers may cause personnel to fall and cause casualties.

Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction filter is blocked, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.

The correct operation of the hydraulic boarding bridge is good maintenance, and how to operate it correctly. Let me briefly introduce the operating steps of the hydraulic boarding bridge, hoping to bring more help to everyone.