SitaWarehouse boarding bridgeAnalysis of corrosion resistance

announcer:hp161HP196399230 release time:2024-05-11 11:15:31

  1. Before use, check the boarding bridge for obvious damage such as cracks and broken wires.

Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, surface, and foot of the slope, the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part tighten the pipe joint.

There is a flip plate at the top of the bridge deck, which is placed at the edge of the carriage to ensure a smooth transition between the passage and the carriage. Its advantages are as follows.

.Shake the handle to raise the boarding bridge to the height of the container.

The safety valve of the mobile hydraulic boarding bridge can also generate high noise. When air is mixed into hydraulic oil, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, we should regularly clean the safety valve, and replace it if it is damaged or severely worn.

To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use,SitaProvincial Mobile Boarding Bridge, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, so it is not a major problem.


SitaWarehouse boarding bridgeAnalysis of corrosion resistance



The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from 7000mm to 7500mm, mainly considering safety and stability of use. For a long time, the manufacturer of the boarding axle has no turnover to avoid the price difference, which is 20% higher than the market value! More than one ton is more expensive!

Application of hydraulic boarding bridges: Hydraulic boarding bridges can be widely used in docks, platforms, warehouses, etc. according to user needs. Special designs can be made in terms of external dimensions, etc. The fixed boarding bridge is installed on the side of the cargo platform, flush with the ground and side of the cargo platform. The bridge deck of a fixed boarding bridge can tilt up and down and its outer end can be higher or lower than the plane of the cargo platform, making it equal to the height of the carriage. There is a flip board at the top of the bridge, which automatically attaches to the edge of the carriage, ensuring a smooth passage between the cargo platform and the carriage.

When working in foundation pits or depths, a helmet must be worn.

Inspection basis.During the application process of hydraulic boarding bridges,SitaAluminum alloy boarding bridge, it is necessary to follow the operating procedures to ensure the normal operation of the equipment. What precautions should we take when using hydraulic boarding bridges?

To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, so it is not a major problem.

The precautions during the use of hydraulic boarding bridges are hoped to be helpful to you.


SitaWarehouse boarding bridgeAnalysis of corrosion resistance



The safety valve of the mobile hydraulic boarding bridge can also generate high noise. When air is mixed into hydraulic oil,SitaWarehouse boarding bridge, the relief valve gets stuck or severely worn, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, we should regularly clean the safety valve, and replace it if it is damaged or severely worn.

build.These are the options for hydraulic oil for mobile boarding bridges.

On a moving steel structure slope, forklifts can also directly enter the interior of truck carriages for bulk loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

During use close attention should be paid to the condition of the equipment, and if there are any problems, the use should be stopped immediately.

Sita.The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

There are three movable boards on both sides of the air conditioning board, which can effectively prevent the adjustment board from falling down and keep the pressure foot in a safe state.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.