HubeiHydraulic fixed boarding axleIndustry development history

announcer:hp161HP196399230 release time:2024-05-08 15:48:43

To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, so it is not a major problem.

Shake the handle to raise the boarding bridge to the height of the container.

Hubei.The seat belt needs to be inspected every six months, with a load of 225 kilograms. The test time is five minutes. After the test check whether the seat belt is broken or deformed, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use. Long term promotion of various brand products such as axle manufacturers, with complete designated products and guaranteed quality

Is the boarding bridge easy to use? Those who have used the boarding bridge know that it is a very useful mechanical equipment, which brings great convenience to the logistics industry and some industrial factories that need to load and unload goods. Some enterprises also value the development prospects of the boarding bridge and set up factory boarding bridges. High priced and various specifications of boarding bridge manufacturers provide timely supply, with high cost-effectiveness, and has become the preferred brand for many wire products. Welcome to choose!

.There is a flip plate at the top of the bridge deck, which is placed at the edge of the carriage to ensure a smooth transition between the passage and the carriage. Its advantages are as follows.

When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge, as well as noise when the pump station enters the air.

Common&quo; Streamline” Open joint planning, with a welding area more than three times that of other traditional pipeline joints, greatly extending the service life and protection life.


HubeiHydraulic fixed boarding axleIndustry development history



To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, so it is not a major problem.

Advantages: Widely used high-altitude work equipment, stable and safe, it is necessary to follow the operating procedures to ensure the normal operation of the equipment. What precautions should we take when using hydraulic boarding bridges?

retailer.Common&quo; Work” Steel structure planning can withstand uniform pressure, and be more robust than other channel structures.

Open planning before placement makes it easy to clean up clutter.

Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, lowering valve is open, overflow valve pressure is low oil level is too low, oil pump is empty, oil suction filter is blocked, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.


HubeiHydraulic fixed boarding axleIndustry development history



Reason for the lifting table not lowering: The lowering valve is malfunctioning, and the lowering speed valve is out of adjustment. Solution: When pressing the lowering button, check if the lowering valve is energized. If there is no electricity, try to eliminate it; If there is electricity, troubleshoot the lowering valve itself or replace the lowering valve. The lowering valve should be kept clean.

system.These are the options for hydraulic oil for mobile boarding bridges.

Features: Shear mechanical structure,HubeiHydraulic boarding bridge mobile type, working height generally ranging from 6 meters to 14 meters, high stability after lifting the platform, wide working platform vehicle and high load capacity,HubeiEmbedded boarding bridge, wide range of high-altitude work, suitable for multiple people working simultaneously. The power form can be selected according to different requirements (such as three-phase AC power supply, single-phase AC power supply, DC power supply, and internal combustion power supply). The manual hydraulic device can lift and retract normally in places with power outage or no power supply, increase the telescopic platform car, and extend to necessary positions in case of insufficient length of the platform car improving work efficiency.

There are three movable boards on both sides of the air conditioning board, which can effectively prevent the adjustment board from falling down and keep the pressure foot in a safe state.

Hubei.The precautions during the use of hydraulic boarding bridges are hoped to be helpful to you.

The length of the electric hydraulic boarding bridge is generally about 10 meters,HubeiMobile hydraulic boarding bridge, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

Common&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque, and be more robust than other channel structures.