GaobeidianBoarding bridge platformCreate brilliance

announcer:hp161HP196399230 release time:2024-04-18 11:16:27

and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.

During use, close attention should be paid to the condition of the equipment, and if there are any problems, the use should be stopped immediately.

Gaobeidian.In the economic field, the safety, punctuality, flexibility, and price to efficiency ratio of transportation are directly related to the fate and survival of enterprises due to different road conditions. Therefore, people have high expectations for commercial freight hydraulic boarding bridges,GaobeidianVehicle boarding bridge, especially those that serve as the main components of trailers and semi trailers. Continuously developing, developing, and producing multiple series and varieties of hydraulic boarding bridges to meet the needs of modern cargo transportation. Below is an introduction to the characteristics of the hydraulic boarding bridge suspension system.

There are three movable boards on both sides of the air conditioning board, which can effectively prevent the adjustment board from falling down and keep the pressure foot in a safe state.

.The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

When it comes to fixed hydraulic boarding bridges, I believe

It is strictly prohibited to apply excessive pile loads around the foundation pit.


GaobeidianBoarding bridge platformCreate brilliance



Monthly maintenance of hydraulic boarding bridges: check for wear on rollers, intermediate shafts and bearings cylinder pins and bearings, boom hinge shafts and bearings, etc; The oil quality and level of hydraulic oil; The hydraulic boarding bridge should be raised throughout the entire process, and at this position, the hydraulic surface should be 40 to 50 millimeters higher than the bottom of the box. The hydraulic oil is darkened, sticky, or has foreign objects such as gravel. If found, it should be replaced in a timely manner; Add some oil to each part to extend the service life of the bearing. The hydraulic boarding bridge has a wide range of uses. Doing the above points well not only ensures your personal safety but also extends the service life of the equipment, making the boarding bridge better serve you.

Solid rubber tires have no inflatable inner tubes and can move and work on various complex surfaces without worrying about puncturing the inner tubes, making them less prone to damage. They have stronger adaptability to the environment. Solid rubber tires have higher load-bearing capacity than ordinary pneumatic rubber tires of the same model, are more wear-resistant, have a longer service life, and are more cost-effective. This is why mobile boarding bridges are now equipped with solid rubber tires.

Connection for. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

Total quality assurance.Operation degree: There are two types of operations that can be used to raise and lower the boarding bridge. One is a manual pump station, which uses manual hydraulic lifting, which is labor-intensive and somewhat labor-intensive. Advantages: It can be operated and used in any situation. Two types of electric pump stations use electric hydraulic lifting and lowering,GaobeidianHydraulic boarding axle fixation, which reduces labor intensity and saves labor. Disadvantage: Once the power is cut off, it will not be able to be used but now there are both manual and electric boarding bridges that are more convenient to use.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, pull out the hook to hook it into the container and there is basically no change to the building structure.

When confirming that the lip is fixed to the container, tighten the chain to ensure that it does not loosen, and press the brake blocks on both sides. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.


GaobeidianBoarding bridge platformCreate brilliance



After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working, the workbench should be lowered to a low position.

Quality improvement.There is a flip plate at the top of the bridge deck, which is placed at the edge of the carriage to ensure a smooth transition between the passage and the carriage. Its advantages are as follows.

B) When maintaining the hydraulic system, only clean plastic plugs can be used to seal the ends of the pipeline.

Common&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque, and be more robust than other channel structures.

Gaobeidian.Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse,GaobeidianContainer boarding bridge, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, lowering valve is open, overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction filter is blocked, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.

Shake the handle to raise the boarding bridge to the height of the container.

There are three movable boards on both sides of the air conditioning board which can effectively prevent the adjustment board from falling down and keep the pressure foot in a safe state.