HenanAutomobile boarding bridge manufacturerWhy does the air volume become smaller after using it for a long time

announcer:hp161HP196399230 release time:2024-02-15 17:18:53

After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working, the workbench should be lowered to a low position.

Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.

Henan.Applicable scenario: Suitable for mobile high-altitude operations such as setting and inspection of high-altitude equipment in various industries.

During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.

.As we all know

What are the issues to pay attention to when using the boarding bridge? For example, mobile boarding bridges are generally used outdoors, and after use, they are also placed outdoors. They are often exposed to wind, rain, and sunlight, which reduces the lifespan of the boarding bridge. Therefore, cover the boarding bridge with a rain cloth to prevent rusting and aging.

After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working, the workbench should be lowered to a low position.


HenanAutomobile boarding bridge manufacturerWhy does the air volume become smaller after using it for a long time



The hydraulic system adopts imported Italian brand products, with excellent performance and minimal maintenance. The oil cylinder lifting power system, inclined plate, and small oil cylinder operation, can be adjusted smoothly. The height adjustment plate is a selected decorative plate and profile, with a long service life. Various qualified manufacturers of boarding bridges are welcome to inquire by phone and sincerely invite cooperation!

Features: Shear mechanical structure, working height generally ranging from 6 meters to 14 meters, high stability after lifting the platform, wide working platform vehicle and high load capacity, wide range of high-altitude work, suitable for multiple people working simultaneously. The power form can be selected according to different requirements (such as three-phase AC power supply, single-phase AC power supply, DC power supply, and internal combustion power supply). The manual hydraulic device can lift and retract normally in places with power outage or no power supply, increase the telescopic platform car, and extend to necessary positions in case of insufficient length of the platform car, improving work efficiency.

Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found collision of the support structure should be prevented especially for the simple boarding bridge.

management.During the excavation process of the foundation pit of the simple boarding bridge construction must be suspended and reported to the superior for handling.

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

It is strictly prohibited to apply excessive pile loads around the foundation pit.


HenanAutomobile boarding bridge manufacturerWhy does the air volume become smaller after using it for a long time



Embedded boarding bridge, as the name suggests, refers to the boarding bridge embedded in the loading and unloading operation platform. The installed boarding bridge main board surface is horizontal with the upper plane of the loading and unloading operation platform. Completely integrated into the platform, it will not affect other operational tasks on the platform without loading and unloading operations. The boarding bridge with this type of structure is widely used and is also a relatively fast boarding auxiliary device. Its design is usually fully standardized as early as the structural design of buildings. We are a long-term manufacturer of boarding bridges. Welcome to inquire

Manufacturing cost.What should I pay attention to when choosing a boarding bridge? The selection and purchase of the boarding bridge involves paying attention to three issues, including its range of use, rated load, and other factors; Their understanding of the manufacturer of the boarding bridge,HenanHydraulic fixed boarding axle, whether their enterprise qualifications, special equipment licenses are complete, how many after-sales service outlets are there in the country, how about their after-sales service attitude, and whether they are timely; The important point is whether the quality is good or not,HenanTelescopic boarding bridge, and whether the price is reasonable. If both of these situations are reasonable, you can choose the products of the manufacturer.

For the safety performance of high-altitude work platform vehicles, it is necessary to have production technology, scientific processes,HenanAutomobile type boarding bridge, and strict management to ensure production. When in use, people, the environment, and machines are the three major links of high-altitude operations, and safety is the basic condition to ensure the smooth progress of high-altitude operations. In the following text, Jiuyi briefly describes the precautions for using high-altitude operation platform vehicles: high-altitude operators must hold a health certificate. Individuals with mental illness, hypertension, or mental illness are not allowed to engage in high-altitude work tasks. Staff are not allowed to engage in high-altitude work while drinking alcohol or feeling mentally drained.

During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.

Henan.The hydraulic boarding bridge not only reduces labor intensity, but also doubles the efficiency of loading and unloading operations, accelerates logistics speed, and achieves significant economic benefits. Hydraulic loading and unloading bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other transport vehicles can directly enter the truck for batch loading and unloading of goods, also known as loading and unloading platforms.

As we all know

Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.