TorenTruck boarding bridgePrecautions for purchase

announcer:hp161HP196399230 release time:2024-02-14 14:35:47

It is strictly prohibited to apply excessive pile loads around the foundation pit.

The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time, according to the characteristics of the work, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems strengthen dynamic management of equipment faults, monitor the status of key parts, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, establish a spare parts warehouse for vulnerable and commonly used parts, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers, strengthen the professional quality and professionalism of lifting platform maintenance personnel,TorenMobile hydraulic boarding bridge, so that they can handle faults in a short period of time.

Toren.(5) Each mechanism in the elevator should be checked for normal operation and any noise or other malfunctions. If any, they should be promptly addressed and resolved. All wires and cables in the mobile boarding bridge should be checked for any damage or damage and if any, they should be promptly wrapped or replaced with new ones.

Check if the manual valve is open. When using, otherwise the boarding bridge may be damaged.

.When working on the hydraulic boarding bridge, the support legs must be extended,TorenHydraulic mobile boarding bridge, and the support leg bolts must be adjusted to ensure that the lifting platform is stably stressed on the support legs and kept horizontal; During the lifting process and in the lifting state, the lifting platform must not be moved, and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use, check whether the electrical equipment is normal; All shaft pin oil holes must be oiled before each use. Before use, it is necessary to perform no-load lifting and check whether the hydraulic system is normal; The load of the workbench should not exceed the rated value and it should not be subjected to intense manual shaking; The hydraulic oil in the oil tank must be replaced every 500 hours of operation.

During construction, the factors of loading and unloading operations were not taken into account. The platform type loading and unloading bridge serves as a remedial solution and can also meet the requirements for loading and unloading operations into truck carriages. The platform type boarding bridge is also designed in various structural forms according to different on-site conditions. It can also be adjusted up (below the cargo platform) or down (below the cargo platform) within a certain range, which can meet the installation and use of most loading and unloading platforms. Is the boarding bridge easy to use? The boarding bridge is an auxiliary equipment used to bridge with the freight car and is designed to solve the height difference between the freight car and the ground. Suitable for fixed or mobile loading and unloading of goods, it is actually equivalent to a slope, allowing forklifts to smoothly enter the carriage to load and unload goods, requiring only one person to quickly load and unload goods, which is labor-saving.

Common&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque, and be more robust than other channel structures.


TorenTruck boarding bridgePrecautions for purchase



As we all know

Check the rollers, intermediate shafts, and bearings; Oil cylinder pin and bearing; Equality and wear of the hinge shaft and bearings of the boom; Add oil to the above components for maintenance of outdoor elevators and factory elevators. Extend the service life of bearings. Professional axle manufacturers and other special products, 20 year old brand, and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.

Sincere service.When the hydraulic oil is insufficient, the hydraulic pump will produce suction phenomenon, causing air to enter the hydraulic oil and also producing high noise. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

When working on the hydraulic boarding bridge the support legs must be extended, the lifting platform must not be moved, and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use, check whether the electrical equipment is normal; All shaft pin oil holes must be oiled before each use. Before use, and it should not be subjected to intense manual shaking; The hydraulic oil in the oil tank must be replaced every 500 hours of operation.

When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge, as well as noise when the pump station enters the air.


TorenTruck boarding bridgePrecautions for purchase



Open the manual valve, slowly lower the boarding bridge, and secure more than 90% of the lip plates at the bottom of the container.

wholesaler.During excavation, if unidentifiable items or unforeseeable situations are found, the operation should be stopped in a timely manner and reported to the person in charge of the hydraulic boarding bridge for handling. The fixed boarding bridge is an auxiliary equipment for loading and unloading in conjunction with the storage platform. This equipment is integrated with the platform and can be adjusted up or down according to the different heights of the truck carriage,TorenVehicle boarding bridge, making it convenient for forklifts to enter the carriage. The equipment adopts an imported hydraulic pump station with anti rolling skirts on both sides, making work safer and improving work efficiency.

High altitude work platform vehicles are mainly divided into four types: scissor type, straight arm type, curved arm type, and vehicular type. Scissor fork type high altitude work platform vehicles.

To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, so it is not a major problem.

Toren.Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.

Open planning before placement makes it easy to clean up clutter.

The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.