ItalyContainer boarding bridgeQuality appraisal problem

announcer:hp161HP196399230 release time:2024-02-14 13:35:21

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

The pressure on the axle will reduce the service life of the boarding axle.

Italy.On a moving steel structure slope, forklifts can also directly enter the interior of truck carriages for bulk loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

When working on the hydraulic boarding bridge, the support legs must be extended, and the support leg bolts must be adjusted to ensure that the lifting platform is stably stressed on the support legs and kept horizontal; During the lifting process and in the lifting state, the lifting platform must not be moved, and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use, check whether the electrical equipment is normal; All shaft pin oil holes must be oiled before each use. Before use, it is necessary to perform no-load lifting and check whether the hydraulic system is normal; The load of the workbench should not exceed the rated value, and it should not be subjected to intense manual shaking; The hydraulic oil in the oil tank must be replaced every 500 hours of operation.

.Open planning before placement makes it easy to clean up clutter.

The hydraulic lifting boarding bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other handling vehicles can directly enter the truck for batch loading and unloading of goods, and single person operations can achieve fast loading and unloading of goods. Reduce a large amount of labor, improve work efficiency, and achieve greater economic benefits for enterprises.

During the excavation process of the foundation pit of the simple boarding bridge, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.


ItalyContainer boarding bridgeQuality appraisal problem



Is the boarding bridge easy to use? Those who have used the boarding bridge know that it is a very useful mechanical equipment,ItalyMobile hydraulic loading and unloading boarding bridge, which brings great convenience to the logistics industry and some industrial factories that need to load and unload goods. Some enterprises also value the development prospects of the boarding bridge and set up factory boarding bridges. High priced and various specifications of boarding bridge manufacturers provide timely supply, with high cost-effectiveness, and has become the preferred brand for many wire products. Welcome to choose!

When conducting high-altitude operations on dangerous edges such as roofs, suspension bridges, slopes, or cliffs, guardrails or safety nets should be installed on the side facing the air or safety belts or ropes should be used.

The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

Product survey.conduct.

The hydraulic boarding bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods, and is our good helper. However malfunctions during use are inevitable. What should we do when encountering a malfunction?

The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.


ItalyContainer boarding bridgeQuality appraisal problem



The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

query.Slowly reverse and park the container under the lip at the front of the boarding bridge.

C) When maintaining hydraulic components, the workbench must be absolutely clean. Check the condition of the tools used. They should also be very clean.

Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil level is too low oil pump is empty, oil suction section is leaking oil suction filter is blocked, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity,ItalyFixed hydraulic boarding axle, the relief valve gets stuck or severely worn, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, we should regularly clean the safety valve, and replace it if it is damaged or severely worn.

During the application process of hydraulic boarding bridges, it is necessary to follow the operating procedures to ensure the normal operation of the equipment. What precautions should we take when using hydraulic boarding bridges?

When working on the hydraulic boarding bridge, the support legs must be extended, and the support leg bolts must be adjusted to ensure that the lifting platform is stably stressed on the support legs and kept horizontal; During the lifting process and in the lifting state, the lifting platform must not be moved, and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use, check whether the electrical equipment is normal; All shaft pin oil holes must be oiled before each use. Before use, it is necessary to perform no-load lifting and check whether the hydraulic system is normal; The load of the workbench should not exceed the rated value, and it should not be subjected to intense manual shaking; The hydraulic oil in the oil tank must be replaced every 500 hours of operation.