ProvHuangshi boarding bridgeThe principle of storage and transportation

announcer:hp161HP196399230 release time:2024-02-10 10:57:32

Slowly reverse and park the container under the lip at the front of the boarding bridge.

When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge, as well as noise when the pump station enters the air.

Prov.On a moving steel structure slope, forklifts can also directly enter the interior of truck carriages for bulk loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

Open the manual valve, slowly lower the boarding bridge, and secure more than 90% of the lip plates at the bottom of the container.

.Operation degree: There are two types of operations that can be used to raise and lower the boarding bridge. One is a manual pump station, which uses manual hydraulic lifting, which is labor-intensive and somewhat labor-intensive. Advantages: It can be operated and used in any situation. Two types of electric pump stations use electric hydraulic lifting and lowering, which reduces labor intensity and saves labor. Disadvantage: Once the power is cut off, it will not be able to be used, but now there are both manual and electric boarding bridges that are more convenient to use.

conduct.

When confirming that the lip is fixed to the container, pull out the hook to hook it into the container, tighten the chain to ensure that it does not loosen, and press the brake blocks on both sides. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, if unidentifiable items or unforeseeable situations are found, the operation should be stopped in a timely manner and reported to the person in charge of the hydraulic boarding bridge for handling. The fixed boarding bridge is an auxiliary equipment for loading and unloading in conjunction with the storage platform. This equipment is integrated with the platform and can be adjusted up or down according to the different heights of the truck carriage,ProvMovable hydraulic boarding bridge, making it convenient for forklifts to enter the carriage. The equipment adopts an imported hydraulic pump station with anti rolling skirts on both sides, making work safer and improving work efficiency.

(5) Each mechanism in the elevator should be checked for normal operation and any noise or other malfunctions. If any, they should be promptly addressed and resolved. All wires and cables in the mobile boarding bridge should be checked for any damage or damage and if any, they should be promptly wrapped or replaced with new ones.

Nowadays,ProvHydraulic boarding axle fixation, the electric hydraulic boarding bridge has become a loading and unloading tool used by many companies. Compared to many friends, I am still not very familiar with electric hydraulic boarding bridges. Below, slope, and height of the electric hydraulic boarding bridge.

Affordable price.As an important part of the boarding bridge, the height can be adjusted according to the different vehicles of the goods, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm, which can be met by almost all freight vehicles (with a general vehicle height of 1600).

Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction filter is blocked, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.

Connection for. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.


ProvHuangshi boarding bridgeThe principle of storage and transportation



Embedded boarding bridge,ProvMobile cllimbing, as the name suggests, refers to the boarding bridge embedded in the loading and unloading operation platform. The installed boarding bridge main board surface is horizontal with the upper plane of the loading and unloading operation platform. Completely integrated into the platform, it will not affect other operational tasks on the platform without loading and unloading operations. The boarding bridge with this type of structure is widely used and is also a relatively fast boarding auxiliary device. Its design is usually fully standardized as early as the structural design of buildings. We are a long-term manufacturer of boarding bridges. Welcome to inquire

Job description.The hydraulic system adopts imported Italian brand products, with excellent performance and minimal maintenance. The oil cylinder lifting power system, inclined plate, top, and small oil cylinder operation, can be adjusted smoothly. The height adjustment plate is a selected decorative plate and profile, suspension bridges, slopes, or cliffs guardrails or safety nets should be installed on the side facing the air, or safety belts or ropes should be used.

Reason for the lifting table not lowering: The lowering valve is malfunctioning, and the lowering speed valve is out of adjustment. Solution: When pressing the lowering button, check if the lowering valve is energized. If there is no electricity, try to eliminate it; If there is electricity, troubleshoot the lowering valve itself or replace the lowering valve. The lowering valve should be kept clean.

Prov.The pressure on the axle will reduce the service life of the boarding axle.

Open planning before placement makes it easy to clean up clutter.

The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, the lowering valve is not tightly sealed, and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.