DusseldorfBoarding bridge platformPulling market demand

announcer:hp161HP196399230 release time:2024-01-22 19:14:43

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.

Dusseldorf.C) When maintaining hydraulic components, the workbench must be absolutely clean. Check the condition of the tools used. They should also be very clean.

For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

.Install a 5m high protective railing around the foundation pit of the simple boarding bridge, with a distance of no less than 1m from the protective railing to the foundation pit. The mobile boarding bridge only requires a single person to operate, without the need for power supply, and can achieve safe and fast loading and unloading of goods. Mobile boarding bridges are widely used in cargo platforms and mobile loading and unloading sites without loading and unloading equipment. They are auxiliary equipment for cargo loading and unloading that is used in conjunction with forklifts. The sequence of earthwork excavation must comply with design conditions and follow" Trenching support, layered excavation, and the lowering speed valve is out of adjustment. Solution: When pressing the lowering button, check if the lowering valve is energized. If there is no electricity, try to eliminate it; If there is electricity,DusseldorfHydraulic boarding bridge, troubleshoot the lowering valve itself or replace the lowering valve. The lowering valve should be kept clean.

What is a hydraulic boarding axle? The hydraulic boarding bridge is a special auxiliary equipment used for fast loading and unloading of goods, and its height adjustment function can build a bridge between the truck and the warehouse platform. What are the operational steps we take during use?


DusseldorfBoarding bridge platformPulling market demand



After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working the workbench should be lowered to a low position.

When the boarding axle is far away from the frame,DusseldorfAutomatic boarding bridge, the rod moves downward to open the air release valve, and the air in the air spring is atmospheric and the body and frame then reduce to the original value. The dual or multi axle air suspension boarding axle can also be lifted on a single or multiple axle when unloaded or partially loaded, which can protect the raised tires. Simultaneously reducing incorrect guidance while reducing tire wear on other axles. In addition, there are other positive effects during the driving process. On the one hand, it generates appropriate stable force when unloaded and partially loaded,DusseldorfMechanical fixed boarding bridge, and on the other hand, it improves the adhesion of the drive shaft.

Portable hydraulic press boarding bridge: It is a widely used type, suitable for places where loading, unloading, and transportation are not fixed or moving; Mobile hydraulic press boarding bridge: suitable for fixed and immovable goods such as ports, cargo platforms, warehouses, etc

Encyclopedic knowledge.Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction filter is blocked oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.

Embedded boarding bridge, as the name suggests, refers to the boarding bridge embedded in the loading and unloading operation platform. The installed boarding bridge main board surface is horizontal with the upper plane of the loading and unloading operation platform. Completely integrated into the platform, it will not affect other operational tasks on the platform without loading and unloading operations. The boarding bridge with this type of structure is widely used and is also a relatively fast boarding auxiliary device. Its design is usually fully standardized as early as the structural design of buildings. We are a long-term manufacturer of boarding bridges. Welcome to inquire

The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, the lowering valve is not tightly sealed, and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.


DusseldorfBoarding bridge platformPulling market demand



The electronic operation is very simple. With just one button, the air conditioning panel will automatically rise. Release the button, adjust the plate to reduce itself, and the hinge is used on the truck.

Quality improvement.When working in foundation pits or depths, a helmet must be worn.

(4) For the connection parts of the mobile boarding bridge careful inspection should be carried out to check for any looseness, such as connecting bolts. If there are any, they should be tightened in a timely manner. In addition, for all connecting shafts, there should be split pins that are thick and sufficient.

During the excavation process of the foundation pit of the simple boarding bridge, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.

Dusseldorf.The hydraulic boarding bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods, and is our good helper. However, malfunctions during use are inevitable. What should we do when encountering a malfunction?

Is the boarding bridge easy to use? Those who have used the boarding bridge know that it is a very useful mechanical equipment, with high cost-effectiveness, and has become the preferred brand for many wire products. Welcome to choose!

As we all know