ShuangluanMobile electric elevatorWhat are the key points of the design plan

announcer:hp323HP155335083 release time:2024-05-26 14:40:17

The appearance of hydraulic boarding bridges to customers, and the demand for boarding bridges is also increasing. However, there are not many manufacturers of corresponding boarding bridges. Many boarding bridge companies are leather bag companies, and they do not produce them themselves, resulting in high prices. What is important is that they do not have a good understanding of the technology of car booths, and there are often deviations when passing on the technical requirements of direct customers to the manufacturers. Therefore, customers who purchase boarding bridges can directly find professional manufacturers. When choosing a boarding bridge, the first thing to consider is the range of use, frequency of work, rated weight, and choose a boarding bridge that is suitable for the requirements of the unit. Conduct market research based on the proposed technical parameters. The first condition for selecting a supplier is to consider the manufacturer of the boarding axle,ShuangluanElectric 6-meter elevator, and then the after-sales service capability. As long as it is a fixed boarding bridge with good product quality, excellent performance, and complete equipment, it can be chosen at a reasonable price.

Purpose The hydraulic lift is widely used in various industrial enterprises and production lines such as automobile container, mold manufacturing, wood processing, chemical filling, etc., to meet the lifting requirements of different operation heights, and can be equipped with various table forms (such as ball, roller turntable, steering, tipping, telescoping), and with various ways (separate, linkage, it has the characteristics of stable and accurate lifting, frequent starting, and large load capacity, Effectively solve various lifting and lowering difficulties in industrial enterprises, making production operations easy.

Shuangluan.Hydraulic boarding axle; Streamline” The open hinge joint design increases the welding area by more than three times compared to ordinary tubular joints, effectively extending the service life and simplifying maintenance.

In addition, it is strictly prohibited to use hammers or other tools during installation to prevent excessive axial or radial force from damaging bearings or gears. Be sure to tighten the installation bolts before tightening the tension bolts. Before installation, clean the anti rust oil on the motor input shaft, positioning boss, and elevator connection parts with gasoline or zinc sodium water. Its purpose is to ensure the tightness of the connection and the flexibility of operation, easy operation, and can enter general lobbies. It can enter and exit the elevator at will with low power consumption, no pollution, and does not harm the ground during work. It can be used for wall work and exploration work, equipped with gantry cross frame accessories, is very suitable for maintenance work in cinemas, auditoriums, etc.

Unscrew the screws on the dustproof hole on the outer side of the elevator flange adjust the PCS system ring to align its side hole with the dustproof hole, and tighten the inner hexagon. Afterwards, remove the motor shaft key.

Systems: explosion-proof electronic control system, remote control system,ShuangluanMobile elevator, and PIC system. Professional elevator manufacturers have stable, safe, reliable performance, and can achieve maintenance free. Their technical level has reached the domestic level and reached the advanced level of similar international products


ShuangluanMobile electric elevatorWhat are the key points of the design plan



Walking: assisted self-propelled, two wheel traction, self driving, and car modification.

The main categories of aluminum alloy elevators in the Chinese market are based on the structural form of aluminum alloy elevators. Aluminum alloy lifting platforms can be divided into the following types: single column aluminum alloy lifting platforms, which are light and small in equipment, flexible in movement generally no more than 12 meters in height, and generally have a load capacity of less than 150 kilograms, especially suitable for one person operation.

Install two more standard sections. Check and adjust the verticality of the guide rail frame with a theodolite to ensure that the error in two mutually perpendicular directions meets the requirements of Table 1. The above two parts are about the installation precautions for the elevator. If your work involves operating or installing the elevator, everyone must pay attention to safety.

Management Department.The current should exceed the rated current, and even cause the motor to stop on its own. If the shutdown time is slightly longer and the power supply is not cut off, the winding will not only overheat severely, but also burn out. When a star connected motor is mistakenly connected into a triangle, or a motor with multiple coil groups connected in series into a branch is mistakenly connected into two parallel branches, it will cause the winding and iron core to overheat, and in severe cases, and even cause the motor to stop on its own. If the shutdown time is slightly longer and the power supply is not cut off, the winding will not only overheat severely, but also burn out. When a star connected motor is mistakenly connected into a triangle or a motor with multiple coil groups connected in series into a branch is mistakenly connected into two parallel branches, it will cause the winding and iron core to overheat, and in severe cases, the winding will be burned out.

The method is that it may cause increased wear and inflexibility of the parts, and it is also important to pay attention to the installation precautions corresponding to the working environment and not be careless. Proper installation, use, and maintenance of elevators are important steps to ensure the normal operation of mechanical equipment. Therefore, when installing the elevator, please be sure to strictly follow the installation and use related matters below, and carefully assemble and use it.


ShuangluanMobile electric elevatorWhat are the key points of the design plan



Before connecting the motor to the elevator, the elevator manufacturer should first make the motor shaft keyway perpendicular to the tightening bolt. To ensure uniform force, please first screw on the installation bolts at any diagonal position but do not tighten them. Then, screw on the installation bolts at the other two diagonal positions and tighten the four installation bolts one by one. Afterwards, tighten the tightening bolts. All tightening bolts require torque wrenches to be fixed and inspected according to the indicated fixed torque data. Elevators and lifting platforms are widely used special equipment for high-altitude operations. Its scissor fork mechanical layout ensures high stability after the elevator is lifted, with a wide operating range and high load-bearing capacity, making high-altitude operations increasingly large-scale and supporting multiple people working together. It makes high-altitude operations more powerful and safe. It is a widely used specialized equipment for high-altitude operations.

Process inspection.In addition, it is strictly prohibited to use hammers or other tools during installation to prevent excessive axial or radial force from damaging bearings or gears. Be sure to tighten the installation bolts before tightening the tension bolts. Before installation, clean the anti rust oil on the motor input shaft, positioning boss, and to prevent unnecessary wear and tear.

Improper use of oil: Inadequate maintenance of high-altitude work platform equipment such as mobile elevators can also lead to small fitting gaps of components, making it difficult for oil to form a uniform oil film on the friction surface. Additionally, due to assembly and other reasons, it is difficult to ensure the uniformity of fitting gaps, thereby reducing efficiency and causing early abnormal wear of equipment components; In severe cases, it may cause scratches or bite on the friction surface of precision fitting, leading to the occurrence of abnormal equipment noise.

The power unit adjustment, whether it is a scissor type lifting platform or a guide rail type lifting cargo elevator,Shuangluan2 ton electric elevator, is composed of the power unit and the oil cylinder. The power unit has four outlets during production, which can be adjusted to increase or decrease the hydraulic oil flow rate of the oil cylinder. We can adjust the motor speed or the electro-hydraulic proportional valve to adjust the hydraulic oil flow rate; What factors will affect the lifting speed of hydraulic elevators? The longer the hydraulic oil pipe, the longer the lifting time. Therefore, during installation, the length of the oil pipe should be minimized as much as possible within the allowable range of the design; On the basis of adjusting the power unit, the size of the oil pipeline can also be adjusted, and corresponding adjustments can be made while ensuring that the equipment meets normal demand and safety.

Shuangluan.In addition, it is strictly prohibited to use hammers or other tools during installation to prevent excessive axial or radial force from damaging bearings or gears. Be sure to tighten the installation bolts before tightening the tension bolts. Before installation, clean the anti rust oil on the motor input shaft, positioning boss, and elevator connection parts with gasoline or zinc sodium water. Its purpose is to ensure the tightness of the connection and the flexibility of operation, and to prevent unnecessary wear and tear.

The loading and unloading mobile boarding bridge has become a very common structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to quickly enter and exit transportation vehicles for loading and unloading operations.

The normally closed valve and motor are energized simultaneously; The solution is correct wiring, and the motor often closes the valve and loses power when powered on.