Kefeld6-12 meter fully automatic elevatorSpecification model

announcer:hp323HP155335083 release time:2024-04-18 12:24:41

The boarding bridge can be divided into two forms: a mobile boarding bridge and a fixed boarding bridge. A brief introduction to the application scope of a fixed boarding bridge and the use of a mobile boarding bridge: used in places without loading and unloading platforms or where mobile loading and unloading of goods are required. If there is no loading and unloading platform at the logistics site, as a remedial measure, a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope, and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

High altitude operations involving single person work such as high-altitude cleaning. Products, tens of millions of products for you to choose from, professional elevator manufacturers ensure safe trading

Kefeld.Prepare the foundation according to the basic plan pay attention to finding, leveling, and aligning points, and ensure the level of the foundation and various usage requirements.

Staying below high-altitude work sites is prohibited, and safety nets or other protective devices should be installed below the work site to avoid injury from falling objects.

.The normally closed valve and motor are energized simultaneously; The solution is correct wiring, and the motor often closes the valve and loses power when powered on.

The hydraulic lifting platform mainly uses hydraulic oil pressure transmission to achieve the lifting function. Its shear fork mechanical structure provides stability for the lift. The wide working platform and high bearing capacity make the high-altitude operation range wide and suitable for multiple people to work simultaneously. It makes high-altitude operations efficient and guaranteed.

The current should exceed the rated current, and even cause the motor to stop on its own. If the shutdown time is slightly longer and the power supply is not cut off, but also burn out. When a star connected motor is mistakenly connected into a triangle, or a motor with multiple coil groups connected in series into a branch is mistakenly connected into two parallel branches, it will cause the winding and iron core to overheat, and in severe cases, the winding will be burned out.


Kefeld6-12 meter fully automatic elevatorSpecification model



Systems: explosion-proof electronic control system, remote control system, and PIC system. Professional elevator manufacturers have stable, safe, reliable performance, and can achieve maintenance free. Their technical level has reached the domestic level and reached the advanced level of similar international products

Multi column aluminum alloy lifting platform is widely used for cleaning and circuit maintenance of the top floor of airports, shopping malls, and star hotels. It has a high elevation, low self weight, flexible movement, and simple design.

High altitude work is now also very common, and elevators are also highly demanded by the market. Many high-rise transportation tasks are completed by elevators, with high efficiency and reassuring safety. However, attention should also be paid to the installation of the elevator, otherwise there may be problems, and no one wants to see such a situation happen. What are the installation precautions for elevators?

Promotion.Many people believe that the mechanical strength of the elevator itself is relatively high when using it so during the installation process, there is no

The load capacity of goods and the tonnage of goods transported at once also affect the speed of lifting and lowering. Achieving the excellent value of the lifting platform for transporting goods is a guarantee of speed. If the weight is too heavy, it affects the speed. If the goods are too light, it also affects the normal transportation time.

The hook of the seat belt should not be hung on unstable or moving objects.


Kefeld6-12 meter fully automatic elevatorSpecification model



Hydraulic lifting platforms can be divided into: four wheel mobile, car modification, car type, auxiliary self-propelled, and lifting heights ranging from a meter to 1 meter.

Potential development.The hydraulic lifting platform mainly uses hydraulic oil pressure transmission to achieve the lifting function. Its shear fork mechanical structure provides stability for the lift. The wide working platform and high bearing capacity make the high-altitude operation range wide and suitable for multiple people to work simultaneously. It makes high-altitude operations efficient and guaranteed.

At this point, if the high-altitude work platform is overloaded, it may cause damage to the components and cause some mechanical failures.

Gear pump worn,Kefeld20 meter mobile elevator, aged or damaged; The solution is to replace the gear pump. Professional elevator manufacturers have advanced technology, strict testing, more affordable prices, easy operation, and can enter general lobbies. It can enter and exit the elevator at will with low power consumption, no pollution, and does not harm the ground during work. It can be used for wall work and exploration work, and there are no dead corners during work. The single column aluminum alloy electric elevator, equipped with gantry cross frame accessories,KefeldElectric 6-meter elevator, is very suitable for maintenance work in cinemas, auditoriums etc.

Dirty normally closed valve; The solution is to remove the normally closed valve and use cleaning agent or cleaning.

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).