TurkuWorkshop second floor elevatorQuality inspection method

announcer:hp323HP155335083 release time:2024-02-23 10:50:01

Introduction to Fixed Boarding Bridge Loading and unloading Mobile Boarding Bridge is a very common structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to quickly enter and exit transportation vehicles for loading and unloading operations.

High altitude operations involving single person work such as high-altitude cleaning. Products, tens of millions of products for you to choose from, professional elevator manufacturers ensure safe trading

Turku.Fixed elevators are a type of transportation equipment that directly lifts and unloads goods from the ground. They are mostly used for goods transportation between height differences in production lines, material loading and unloading, component lifting during large-scale equipment assembly, fixed three-dimensional parking, and other places. So what is the new price for fixed elevators?

Check the hydraulic oil quality and level. When the lifting platform is raised to a high position, the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.

.2: Chemical rust removal mainly involves the use of acid to react with the metal components of the screw elevator to remove rust products from the rust surface of the push rod. This type of rust removal is mainly used for large mechanical screw elevators, and attention should be paid to protecting precision devices such as electronic instruments from acid corrosion during use.

When working at heights exceeding 1.5 meters safety nets or safety belts must be used.

Elevator cables play an important role in elevators, the editor will summarize how to choose good elevator cables for everyone. Long term improvement of various brand products such as elevator manufacturers but do you know how to choose good cables? Below, with complete designated products and quality assurance


TurkuWorkshop second floor elevatorQuality inspection method



Connect the motor naturally to the elevator. When connecting, and the outer flanges of the two are parallel. Inconsistent alignment can lead to motor shaft breakage or elevator gear wear.

Prepare the foundation according to the basic plan, leveling, and aligning points, and ensure the level of the foundation and various usage requirements.

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor,TurkuFor elevator construction sites, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).

Quality assurance.Check the rollers, intermediate shafts,TurkuSmall elevator for restaurants, and bearings; Oil cylinder pin and bearing; Equality and wear of the hinge shaft and bearings of the boom; Add oil to the above components for maintenance of outdoor elevators and factory elevators. Extend the service life of bearings.

The loading and unloading mobile boarding bridge has become a very common structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to quickly enter and exit transportation vehicles for loading and unloading operations.

Dirty normally closed valve; The solution is to remove the normally closed valve and use cleaning agent or cleaning.


TurkuWorkshop second floor elevatorQuality inspection method



Single column aluminum alloy elevator: This series of products is indoor and widely used for high-altitude operations in various industries such as star hotels and large supermarkets. It has lifting balance, easy operation, no pollution, and does not harm the ground during work. It can be used for wall work and exploration work, and there are no dead corners during work. The single column aluminum alloy electric elevator, equipped with gantry cross frame accessories, is very suitable for maintenance work in cinemas, auditoriums, etc.

Market trend.The set pressure of the elevator price regulating valve is insufficient; The solution is to adjust the pressure valve. Professional elevator manufacturers have high pressure resistance, fire and high temperature resistance, strong overload capacity corrosion resistance, radiation resistance, and long service life

Novice operators should pay attention to which equipment wears quickly when operating mobile elevators: Due to factors such as the processing and installation of high-altitude work platform equipment components such as mobile elevators, the equipment surface is rough,TurkuScissor lift, the area is small, and the load bearing is uneven, which can cause equipment wear. During the operation of high-altitude work platform equipment such as mobile elevators, the concave and convex parts on the surface of the parts are embedded and friction with each other, and metal debris undergoes secondary friction with the equipment, which will accelerate the wear and tear of the surface of the equipment parts. Therefore, mobile elevators and other high-altitude work platform equipment are prone to wear and tear of components during the running-in period, with a fast wear rate.

Teach you how to choose elevator cables. When choosing elevator cables, you should follow the following two principles: good electrical parameters; During the movement of the cable with the elevator, there will be a section in the middle that undergoes bending deformation due to gravity, causing changes in electrical parameters such as impedance and distributed capacitance of the cable. Poor quality cables have significant parameter changes when subjected to force deformation,

Turku.2: Chemical rust removal mainly involves the use of acid to react with the metal components of the screw elevator to remove rust products from the rust surface of the push rod. This type of rust removal is mainly used for large mechanical screw elevators, and attention should be paid to protecting precision devices such as electronic instruments from acid corrosion during use.

Use a heavy crane to lift the cage and accurately position it from above the standard section; Place the two suspension cages on the guide rail frame and slowly place them on the buffer spring. Prepare the drive frames of the two suspension cages and adjust each back wheel and roller to a position with a large gap to facilitate the installation of the drive frame. Install a standard section on the basic part of the elevator using heavy equipment and tighten the connecting bolts. Install two sets of drive frames above each suspension cage using heavy equipment and thread the connecting pins, and install the cage top guardrail.

Install two more standard sections. Check and adjust the verticality of the guide rail frame with a theodolite to ensure that the error in two mutually perpendicular directions meets the requirements of Table 1. The above two parts are about the installation precautions for the elevator. If your work involves operating or installing the elevator everyone must pay attention to safety.