CaenElevating cargo elevator 1-4 floorsTo make the service tangible

announcer:hp779HP136589660 release time:2024-07-03 16:12:46

Secondly, there should be no dirt on the friction surface. If there is any dirt, it should be washed off with gasoline or thinner; The reduction gearbox, gearbox, external meshing gear, and other parts of the equipment, as well as the hydraulic oil, must be tested according to the requirements in the table; Correct maintenance of the hydraulic guide rail elevator: Regularly inspect the wire ropes at various parts for broken wires and looseness. If any such phenomenon is found, replace it in a timely manner. The maintenance of the wire ropes must be carried out in strict accordance with the specifications; Check the connection condition of each part according to the braking rules and regulations. If there is any looseness, tighten it in a timely manner. Check the tightness of the connecting bolts of the equipment when the body is under pressure. All connecting shafts should be equipped with cotter pins; Check whether the operation of each mechanism is normal, whether there are noises and faults according to regulations, and promptly remove all faults; When installing, disassembling, and adjusting the rotating mechanism of the equipment, it is important to note that the reducer and the gear center line should be parallel, and the meshing clearance should be appropriate; Regularly conduct a comprehensive inspection of the equipment to see if there is any damage to the wires and cables, and if there is overheating of the motor. Replace the motor in a timely manner and eliminate the fault before continuing operation; Ensure that the bearings, boxes, distribution boxes, and brushes of the motor are kept clean, and that the travel switch points of each safety device must be safe and reliable.

Frequently check for water accumulation and humidity. It is inevitable for aerial vehicles to drive in rainy and snowy weather, or muddy roads. The bottom and some gaps and indoor floors are prone to sludge accumulation. If the owner does not clean them in a timely manner, this can cause moisture to hide. Therefore, activities in the outer edges of wheel hubs, doors, bottom corners of tree trunks, key holes, as well as other areas, should be regularly inspected,CaenCustomized cargo elevator, and the drainage holes in the doors and various parts should be kept unblocked to ensure that the car seat covers, such as humidity,CaenHydraulic lifting cargo elevator, carpets, and floors, prevent rust from forming parts.

Caen.Many times, when ordering a large lifting platform, after the customer has determined the parameters, the designer will first consider various factors before designing, including the size during transportation, to prevent it from being difficult to transport to the customer's installation site after being too wide. Therefore during design and manufacturing, it is necessary to consider separate assembly or table split to meet the requirements. At the same time, it is also necessary to consider the bearing capacity of the split, design and manufacture on the premise of ensuring the load capacity and stability, and ensure that the equipment can be easily transported, and moved.

Fixed elevator is a transportation equipment that directly lifts and loads goods from the ground. It is mainly used for goods transportation between height differences in production lines, material loading and unloading, component lifting during assembly of large equipment, fixed three-dimensional parking, and other places. So what is the new price for fixed elevators?

.Hydraulic lifting platforms are widely used in factory maintenance, municipal construction, and decoration of hotels in industrial and mining enterprises, with reliable quality and perfect performance.

Unscrew the screws on the dustproof hole on the outer side of the elevator flange, adjust the PCS system ring to align its side hole with the dustproof hole, and tighten with the hexagon socket. After that, remove the motor shaft key.

'Using the elevator is not about maintaining and overhauling the equipment after it has failed. It is important to maintain the equipment in accordance with the correct maintenance and overhaul. First,CaenRail lift cargo elevator, do the preparatory work to eliminate all possible fault problems and accidents. I hope that today's summary of knowledge points by the editor can help everyone.'.


CaenElevating cargo elevator 1-4 floorsTo make the service tangible



Walking: assisted self-propelled, it was found that there were two main causes: loss of hydraulic pressure and car modification.

After careful inspection self driving, and leakage of hydraulic valves or seals.

The cleanliness of the hydraulic station is an important aspect of the elevator hydraulic station, so it should not be taken lightly. Moreover, from a professional perspective, there are relevant rules and requirements. You should refer to the specification manual, so that you can have a correct understanding and know how to achieve better cleanliness.

Sampling inspection.Precautions for using guide rail type elevators: Overloading and transporting flammable and explosive products are strictly prohibited.

Several types: motor winding open circuit. When one phase of the motor winding is open circuit, or one of the parallel branches is open circuit, two wheeled traction type, vehicle modified type, vehicle type, auxiliary self-propelled type and the lifting height varies from a meter to 1 meter.


CaenElevating cargo elevator 1-4 floorsTo make the service tangible



Before connecting the motor to the elevator, the elevator manufacturer should first make the motor shaft keyway perpendicular to the tightening bolt. To ensure uniform stress, first screw on the mounting bolts at any diagonal position, but do not tighten them. Then screw on the other two mounting bolts at diagonal positions, and then tighten the four mounting bolts one by one. After that, tighten the tightening bolts. All tightening bolts shall be fixed with a torque wrench according to the indicated fixed torque data, and the use of elevators and lifting platforms shall be checked

Quotation sheet.What is the new price for fixed elevators? Professional improvement of the quality assurance of the elevator factory. Preferential activities are ongoing, welcome new and old customers to consult

In fact, it is also important to pay attention to some details as follows: It is actually difficult to pierce the bearings into the shaft pins when excessively installing them. However, sometimes, some people think of using a hammer to hammer the bearings to facilitate the installation, and use brute force during installation. In fact, which is the main reason for causing bearing damage and reducing the service life of the bearings. So when installing bearings, we must not go too far. Fortunately, we can place some soft cloth or cardboard on top of them before installing them.

Different. (Specific bearing capacity and lifting height can be designed and customized according to user requirements)

Caen.Unscrew the screws on the dustproof hole on the outer side of the elevator flange, adjust the PCS system ring to align its side hole with the dustproof hole, and tighten with the hexagon socket. After that, Italian imported pump station with external protective devices: organ m type, mesh type, and iron plate sealed type.

Low cost: Compared to the scissor type mobile lifting platform, the cost is much lower. Therefore, when purchasing a lifting platform, it is necessary to consider the use range, frequency of work, load, and other factors of the lifting platform to select a lifting platform suitable for the work requirements.