XuanhuaElevating cargo elevators from first to second floorsIntroduction to the steps of the process

announcer:hp779HP136589660 release time:2024-03-14 12:38:59

Hydraulic pump station: domestic lifting platform dedicated pump station,XuanhuaConstruction site lifting and cargo elevator lifting, Italian imported pump station with external protective devices: organ m type, mesh type, and iron plate sealed type.

Systems: explosion-proof electronic control system, remote control system, PIC system.

Xuanhua.Failure Analysis of Mobile Elevator

Precautions for using guide rail type elevators: Overloading and transporting flammable and explosive products are strictly prohibited.

.Safety performance: The lifting structure is made of high-strength manganese steel rectangular tubes with a scissors type mechanical mechanism, easy to maintain, strong stability, and high bearing capacity. The lifting height is about 10 meters, and the load capacity is about 10 tons.

Usage: Scissor fork type fixed lifting platforms are mostly used for goods transportation between height differences in production lines, loading and unloading materials, adjusting the working height during workpiece assembly, feeding materials to loading machines at high altitudes, lifting components during assembly of large equipment, matching storage and loading sites with forklift trucks and other transportation vehicles for rapid loading and unloading of goods, vehicle lifting, fixed three-dimensional parking, and other places.

The water cooling of hydraulic stations is generally tubular water cooling, and the type selection is based on the heat load to calculate the heat exchange area, while the air-cooled elevator is conducted using an air cooler, and the heat exchange capacity is calculated based on the heat load. Then, the type selection calculation is performed when the flow can be satisfied. Therefore, the two types of cooling are different, and there are significant differences. Long-term lifting and lowering of cargo elevator factory


XuanhuaElevating cargo elevators from first to second floorsIntroduction to the steps of the process



Is the water cooling and air cooling of the hydraulic station the same?

When using, the four legs should be firmly supported on a solid ground (subject to the fact that the walking wheel is about to leave the ground). Sleepers can be used when necessary.

Test the goods elevator every day to see if it can operate normally.

Where is good.Outriggers: mechanical outriggers, hydraulic outriggers, ordinary hand cranking outriggers, do the preparatory work to eliminate all possible fault problems and accidents. I hope that today's summary of knowledge points by the editor can help everyone.'.

Incorrect connection of the elevator motor When a coil, coil group, or one phase winding group is connected inversely, it can cause a serious imbalance in the three-phase current and cause the winding to overheat.


XuanhuaElevating cargo elevators from first to second floorsIntroduction to the steps of the process



Fixed elevator is a transportation equipment that directly lifts and loads goods from the ground. It is mainly used for goods transportation between height differences in production lines, component lifting during assembly of large equipment, fixed three-dimensional parking, and other places. So what is the new price for fixed elevators?

Safety and health.The brake operators of each mechanism on the equipment should regularly check and adjust the clearance of the brake shoe and brake wheel,XuanhuaProduction of lifting cargo elevators, ensuring flexibility and reliability. Long term improvement of the elevator factory, a 20 year old brand with competitive prices and guaranteed quality!

When working in a hot environment, pay attention to heat dissipation.

For guideway elevators installed outdoors they are often exposed to rain and sunlight, with a scissors type mechanical mechanism,Xuanhua2 ton lifting cargo elevator, easy to maintain, strong stability and high bearing capacity. The lifting height is about 10 meters, and the load capacity is about 10 tons.

Carefully prepare a special construction plan for installation and construction, and provide safety technical disclosure to installation personnel.

Does the cleanliness of the hydraulic station have relevant rules and requirements?