KircheHydraulic lifting platform smallHigh temperature and high pressure

announcer:hp391HP142030639 release time:2024-01-22 16:43:33

If there are problems inside the elevator and electrical professionals are present, any components of the hydraulic system should be disassembled and repaired in a completely depressurized condition.

If the elevator malfunctions, it is necessary to have corresponding inspection routes. If the route malfunctions and the joint becomes loose, it is necessary to turn it on or off properly. In this case, there may be short lines or damaged components. Using a table for inspection is relatively better.

After 5000 hours of operation of the elevator, repair the mechanical and electrical systems.

.Regularly check all wires and cables for damage,KircheMobile hydraulic platform, and promptly wrap and replace the damaged parts.

The boarding bridge can be divided into two forms: a mobile boarding bridge and a fixed boarding bridge. A brief introduction to the application scope of a fixed boarding bridge and the use of a mobile boarding bridge: used in places without loading and unloading platforms or where mobile loading and unloading of goods are required. If there is no loading and unloading platform at the logistics site, as a remedial measure, a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope, and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

After 5000 hours of operation of the elevator, repair the mechanical and electrical systems.


KircheHydraulic lifting platform smallHigh temperature and high pressure



When using the elevator, the legs must be opened first. If the legs are not lifted, it is strictly prohibited to lift them.

Especially when its pipes are in use, they are quite boring and can roll, so in this case, they need to be blocked or tied tightly. This is relatively appropriate, so it is necessary to pay attention to these details during use. Especially for unmanned protective lifting platforms, it is not allowed to carry people during use, and it is strictly prohibited to carry people. If the electric lifting platform carries people during use, it is equipped with railings or anti crack valves, which are mainly used to prevent the oil pipe from breaking or causing its workbench to fail during use and then descend.

In short, when using a fixed loading and unloading platform, there is basically no need to worry about stability, as the manufacturer has taken many measures in this regard, providing more guarantees, so many times it can be used with confidence.

Design brand.The reduction gearbox, external gear teeth, and other parts, as well as the hydraulic oil, are all carried out according to the requirements in the table.

When the motor overheats, it should be stopped immediately, and after troubleshooting it should continue to operate. The motor bearings should be in good condition.

The seat belt needs to be inspected every six months,KircheElectric hydraulic lifting platform, with a load of 225 kilograms. The test time is five minutes. After the test check whether the seat belt is broken or deformed, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.


KircheHydraulic lifting platform smallHigh temperature and high pressure



Check the rollers, intermediate shafts, and bearings; Oil cylinder pin and bearing; Equality and wear of the hinge shaft and bearings of the boom; Add oil to the above components for maintenance of outdoor elevators and factory elevators. Extend the service life of bearings.

assets.The brakes of each mechanism should be regularly checked and adjusted for the clearance between the brake pads and brake wheels to ensure flexibility and reliability. There should be no dirt on the friction surface. If there is dirt, it must be cleaned with gasoline or rare materials.

For lifting platforms without manned protection, it is strictly prohibited to carry people during use. At the same time, attention should be paid during use to prevent damage to hands, feet, and clothing.

Pay attention to checking each part of the steel wire rope for broken wires and loose strands. If the tide passes through the relevant regulations, it must be replaced immediately. The maintenance and upkeep of steel wire ropes should strictly follow the provisions of GB5144-85.

Kirche.When working at heights exceeding 1.5 meters, as a remedial measure,KircheElectric hydraulic lifting platform, a mobile boarding bridge is a very suitable solution. The mobile boarding bridge is equivalent to a moving steel structure slope and forklifts can also directly drive into the truck carriages for batch loading and unloading operations. Fast loading and unloading of goods can be achieved with only one person operating and without the need for power supply.

If hydraulic elevators are used on campus, it can better enhance the safety and security of the campus. For campuses, especially after school every day, there are a large number of parents and there are also safety hazards such as people and cars. Maintaining order in such situations is a good idea.