DaculaParameters of 250kVA oil immersed transformerThe demonstration effect in the industry has achieved results

announcer:hp122HP117294921 release time:2024-01-07 11:51:41

The flange surface is uneven, the tightening bolts are loose,DaculaS11 technical parameters of power transformer, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.

Oil leakage at looper flange

Dacula.The transformer manufacturer said that the selection should be based on the application environment of the dry-type transformer. For the extremely extreme environment,DaculaBid winning transformer of State Grid, the dry-type transformer should be poured with epoxy resin glue. Because this kind of environment does not need to heat the dry-type transformer, it can operate immediately. However, for the general application environment, the class H dry-type transformer can be used.

For the leakage that has already occurred, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation the goal of long-term treatment of leakage can be achieved.

.Power transformer

Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.

Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.


DaculaParameters of 250kVA oil immersed transformerThe demonstration effect in the industry has achieved results



In relay protection dry-type transformer, the disconnection of the fault point is related to each other. In a word, if there is any problem at a certain point, it will affect the whole power circuit

Transformer manufacturers generally adopt IP20 protective casing, which can avoid the entry of solid dirt with a diameter of more than 12mm, rats,DaculaS13-50 power transformer, snakes, cats, birds and other animals, resulting in vicious common faults such as short-circuit fault and power failure, which can avoid being equally divided with the above IP20 protective effects However IP23 protective casing can be adopted, IP23 casing will reduce the refrigeration capacity of the transformer, so pay attention to the reduction of its operating volume.

How much is the power transformer

reform.The key reason for oil leakage is that there are defects in cast iron parts

Different diversion methods, dry-type transformers mostly use silica gel waterproof casing, while oil transformers mostly use porcelain waterproof casing;

The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ 4Ω, The resistor is generally more than 2000 & omega;, According to Ohm's law, when the insulating layer is damaged, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.


DaculaParameters of 250kVA oil immersed transformerThe demonstration effect in the industry has achieved results



The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

Application process.Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

Several detection methods for installing transformer

If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear 4 round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for 100mm, stop the lifting, stabilize the bell cover and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.

Dacula.There are many connection groups of dry-type transformers, and the selected structures and connections are also different. Then what are the groups of dry-type transformers? How to carry out the connection? Or basically introduce it with the network of dry-type transformer manufacturers.

Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, snow, wind and sand.

The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.