Tokyo International AirportDry type transformer model scb10The professional market is picking up and the price is going to fly

announcer:hp122HP117294921 release time:2024-01-03 10:17:27

The power transformer conductor refers to the connecting transmission line between each electromagnetic coil,Tokyo International AirportState Grid transformer, between the electromagnetic coil and the group outlet pipe, and between the electromagnetic coil and the tap changer.

Oil leakage at electric welding position

Tokyo International Airport.The insulation of the through core anchor bolt clamping the iron core is damaged, resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;

& ldquo; YN, D11 & rdquo;, in which 11 indicates that when the working voltage phasor of the primary side line, as the minute hand, the phase voltage phasor of the secondary side is at 11 o'clock. That is, the phase voltage UAB of the secondary side lags 30 degrees behind the working voltage uab330 of the primary side line (or 30 degrees ahead).

.For the leakage that has already occurred, find the leakage point first, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.

The switching power supply lacks one phase of power;

Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, which can control the oscillation below 0.2%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.


Tokyo International AirportDry type transformer model scb10The professional market is picking up and the price is going to fly



Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).

Dry type transformer is a common electrical equipment, which can be used to convert the alternating voltage of one standard value into another standard value of the same frequency. The step-up dry-type transformer is used to convert the low-grade alternating voltage into another high-grade alternating voltage of the same frequency. It is widely used in high-frequency industries, such as variable frequency power supply.

The flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.

index.(III) dry type transformers of 315KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than 5m; The distance between the electrified part and the road surface shall not be less than 5m.

Connection group structure of dry-type transformer

Loose core screw


Tokyo International AirportDry type transformer model scb10The professional market is picking up and the price is going to fly



For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation the goal of long-term treatment of leakage can be achieved.

Production department.When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.

Hand touch method for transformer inspection

Causes of fire in power transformer

Tokyo International Airport.Brief introduction of zero line of power transformer

Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.

The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage,Tokyo International Airport315 KVA oil type transformer, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.